background image

T

HE

 425 D C

ONTROL

 P

ANEL

 

G

ENERAL

 D

ESCRIPTION

 

 

The FAAC 425 D control panel is used to operate the 

following models. 

 

 

Swing gate operators

415       412 

390      770 

 

The 425 D programming controls the following: 

 

Operating logic

: A, EP, logics available. 

  

Pause time between opening and closing

: Done 

during the motor programming time. 

 

Opening/Closing time

: Self Learning. (During the 

programming stage 

 

Leaf delay on closing

: adjustable from 1.5 to 10 

seconds. 

 

Leaf delay on opening: 

1.5  

 

The 425 D control panel should be installed in an 

enclosure that is conveniently located as close as 

possible to the gate operator. All electrical 

connections from the control panel to the operator 

must be made in a weatherproof junction box. 

 

The 425 D control panel requires the 100VA 

transformer (included) 115vac primary and 24vac 

secondary. The power supply should be protected by 

a 15 amp dedicated circuit breaker (not provided). 

 

The installer is responsible for  providing the main 

power breaker switch, and for making sure that the 

entire gate system meets all applicable electrical 

codes. The installer should refer to the installation 

manual for a given operator for more information

 

N

OTE

An installation is U.L. compliant only 

when you install the FAAC operators 

according to the UL325 standards. 

 

I

NSTALLING

 

THE

 425 D C

ONTROL

 

P

ANEL

 

 

Installing the control panel consists of the following 

general steps: 

 

∗ 

Connecting the main power to the control 
panel  

∗ 

Connecting the activating device 

∗ 

Connecting the operator to the control panel 

∗ 

Checking the direction of the motor's rotation 

∗ 

Connecting other devices to the control panel 

∗ 

Set operating modes 

 

C

ONNECT

 

THE

 M

AIN

 P

OWER

 S

UPPLY

 

 

WARNING! 

Turn the main power off before you 

make any electrical connections or before 

programming. 

 

The main power can be provided in a variety of 

different ways. 

 

1)  Bring a 115VAC line into the enclosure and wire 

to the terminals provided, and plug the 

transformer into the outlet provided inside the 

enclosure. 

2)  Plug the transformer into any 115VAC outlet and 

bring the low voltage (24VAC) wires into the 

enclosure wiring them directly to the control 

panel as described below. Be sure to use the 

appropriate size wire for longer runs. 

 

 

C

ONNECT

 

THE

 O

PERATOR

(

S

TO

 

THE

 

C

ONTROL

 P

ANEL

 

 
WARNING

Turn the main power off before you 

make any electrical connections. 

 

 

U

SING

 

A

 J

UNCTION

 B

OX

 

 

If an operator is more than 2 ft away from the control 

panel, you must use a junction box for connection. Use 

a U. L. Listed cord grip where the operator cord enters 

the junction box. 

 

Note

: If you have a one-leaf gate design, the 

operator 

must

 be connected to Motor 1 (terminals 

APM1 and CHM1) in the CN2 Terminal Block 

 

To wire up motor 1, connect the blue wire to terminal 

APM1(on the CN2 terminal strip), the brown wire to 

CHM1.. 

 

 

Note

: If you want to delay the closing of one gate 

leaf in a two-leaf gate design, be sure to connect 

its operator to Motor 1. 

 

In order to wire motor 2 in a bi-parting system, connect 

the blue wire to terminal APM2 (on the CN2 terminal 

strip), the brown wire to CHM2. 

Pag e 14 

Jul y ,   2 00 6  

3 9 0  24 v   O pe ra t or   And  

4 2 5  D  C ontrol   Pa ne l  I nsta ll a ti on  Ma nua l  

T

HE

 425 D C

ONT

R

OL

 P

ANE

L

 I

NSTALLA

T

ION

 I

NS

TRUCTIONS

 

Summary of Contents for 390 24 V

Page 1: ...6 Install the Operator 7 Mounting Dimensions 7 Mounting the Base Plate 7 390 Limit Switch Instructions 10 Exploded View 390 24V Operator 12 390 24V Operator Parts List 13 The 425 D Control Panel Gene...

Page 2: ...affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you choose to install on your gate must be designed for the type and size of your gate and for the...

Page 3: ...ower before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a result 5 This equipment may reach high temperatures during operation theref...

Page 4: ...ximum leaf length ft m 14 3 Maximum leaf swing deg 120 Figure 1 390 Operator Dimensions 2 3 8 4 13 1 16 9 7 8 1 4 3 8 4 5 1 6 15 3 4 1 1 3 4 5 1 2 2 3 8 16 1 8 5 1 8 5 1 8 Parameter Measure Motor RPM...

Page 5: ...te any damage because the carrier must witness the damage before you can file a claim As you unpack the box insure that all the parts listed below are included See Figure 2 Control panel enclosure wit...

Page 6: ...et during Basic Programming of the 425 D Control Panel see page 19 for Basic Programming Reversing devices such as inductive loops and photocells should be installed to provide non contact reversing o...

Page 7: ...hose indicated in the technical specifications Make sure that the leaves move properly without any binding during their entire travel Check if hinges are in good condition Make sure the positive stops...

Page 8: ...el Installation Manual A B C max a 2 4 4 5 28 90 4 6 4 5 28 90 6 8 4 5 28 90 8 10 4 5 27 90 10 12 4 5 27 90 12 14 4 5 26 90 2 4 7 8 25 120 4 6 9 10 23 120 6 8 11 12 21 120 8 10 12 13 20 120 Figure 5 D...

Page 9: ...ual Figure 6 Typical overhead outward swing mounting dimensions for garage carriage door applications A B C max a 2 4 4 5 28 90 4 6 4 5 28 90 6 8 4 5 28 90 8 10 4 5 27 90 10 12 4 5 27 90 12 14 4 5 26...

Page 10: ...mit Switches Open and Closed Stops Figure 7 Figure 8 Figure 9 Figure 7 shows how to attach the operator to the base plate Figure 8 shows how to assemble the articulated arm and front bracket Figure 9...

Page 11: ...gate 1 Operator Wire Gauges for Given Voltage 2 Control Panel Enclosure 110 VAC primary 24 VAC 100 VA secondary 3 Photocell A 2 18 AWG A 2 18 AWG 4 Power Switch B 4 14 AWG B 4 14 AWG 5 FAAC 5 Wire Cab...

Page 12: ...Page 12 July 2006 390 24v Operator And 425 D Control Panel Installation Manual The 390 24v Operator...

Page 13: ...13 N A Manual Release Outer 1 14 722471 Mounting Frame 1 15 N A Bushing Brass Bottom 1 16 N A Fender Washer 1 17 N A Motor 24VDC 1 20 N A Motor Housing 24VDC 1 21 N A Snap Ring 1 22 N A Seal Lower 1 2...

Page 14: ...operator to the control panel Checking the direction of the motor s rotation Connecting other devices to the control panel Set operating modes CONNECT THE MAIN POWER SUPPLY WARNING Turn the main power...

Page 15: ...be used to power 24 VDC accessories NOTE The 425 D control panel allows a maximum accessory load of 630mA REVERSING DEVICES Reversing devices include photocells inductive loops and so forth All of the...

Page 16: ...OP and FSWCL should be illuminated except when the reversing devices for opening and closing respectively are triggered Use the LEDs and the next table to determine if the accessory devices you have i...

Page 17: ...ted gate operator s b Op 1 Op 2 OP CL OP CL CN2 CN2 terminal strip 425 D Control Panel Ground CN3 CN4 To the U L Listed gate operator To the U L Listed control panel U L Listed cord grip Junction box...

Page 18: ...Photocells 3 4 Wire Radio Receivers DC Radios Only N C N O COM 24 vdc Relay 1 2 1 2 3 4 5 Additional Reversing Devices TX RX NO C If 4 Wire Receiver Activation Devices Free Exit Loop Phone Keypad C N...

Page 19: ...ore you make any electrical connections or set any switches inside the control panel box To program the automated system the Programming Mode must be accessed The 425D has two push buttons labeled P1...

Page 20: ...he open direction touch the two RESET JMP1 pins see figure 2 with a small screwdriver or piece of wire This will cause the gate to stop 6 Turn the power off to the control panel and reverse the motor...

Page 21: ...oth directions before the automatic operator is installed An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the prope...

Page 22: ...he reversing devices are working properly FSWOP and FSWCL should be illuminated except when a reversing device is triggered If either does not illuminate then one of your reversing devices is preventi...

Page 23: ...Page 23 July 2006 390 24v Operator And 425 D Control Panel Installation Manual NOTES...

Page 24: ...dance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding those set forth in the specifications for such product s...

Reviews: