![F5 8400 User Manual Download Page 27](http://html.mh-extra.com/html/f5/8400/8400_user-manual_535227027.webp)
Installing the IP Application Switch Platform
Platform Guide: 8400 and 8800
2 - 5
• If you are using an Ethernet connection, connect a management
workstation to the management interface (number 1 in Figure 1.3,
on page 1-4).
2. If you have a hardware-based redundant system, connect the
fail-over cable to the fail-over port on each unit (number 3 in Figure
1.3, on page 1-4).
3. Connect the power cable to the power input panel (number 2 in
Figure 1.4, on page 1-5), and then connect it to the power source. If
the system has the DC power option, a readily accessible disconnect
must be incorporated in the wiring for the installation.
4. Turn on the unit and begin licensing the system. For details about
licensing the BIG-IP system, see Chapter 3,
Licensing and
Configuring the BIG-IP System
, in
Installation, Licensing, and
Upgrades for BIG-IP Systems
.
Summary of Contents for 8400
Page 1: ...Platform Guide 8400 and 8800 MAN 0232 02 ...
Page 2: ......
Page 5: ...Table of Contents ...
Page 6: ......
Page 10: ......
Page 21: ...2 Installing the IP Application Switch Platform Installing and connecting the hardware ...
Page 22: ......
Page 28: ...Chapter 2 2 6 ...
Page 30: ......
Page 38: ...Chapter 3 3 8 ...
Page 40: ......
Page 48: ...Chapter 4 4 8 ...
Page 50: ......
Page 58: ......
Page 61: ...7 Understanding Platform Airflow Reviewing platform airflow information ...
Page 62: ......
Page 64: ...Chapter 7 7 2 ...
Page 66: ......
Page 72: ......
Page 78: ...Appendix A A 6 ...
Page 79: ...B Platform Specific Hazardous Substance Levels for China 8400 platform 8800 platform ...
Page 80: ......
Page 83: ...Glossary ...
Page 84: ......
Page 87: ...Index ...
Page 88: ......