Chapter 2
2 - 4
Figure 2.2
Platform installed in a 19" rack
Regardless of which mount type you install the unit into, you finish the
installation by connecting the cables and other hardware. This procedure is
described in
Connecting the cables and other hardware
, following.
Connecting the cables and other hardware
After you have installed the unit into the rack, you need to connect certain
cables and other hardware. To perform these tasks, use the following
procedure. Note that you use this procedure regardless of the type of mount
you installed (front mount or rail mount).
To connect the cables and hardware for input/output
1. Connect the hardware that you have chosen to use for input/output.
For details about connecting the system to a management
workstation or network, see Chapter 2,
Connecting a Management
Workstation or Network
, in
Installation, Licensing, and Upgrades
for BIG-IP Systems
.
• If you are using a serial terminal as the console, connect the serial
cable supplied by F5 Networks to the console port (number 2 in
Figure 1.3, on page 1-4).
Summary of Contents for 8400
Page 1: ...Platform Guide 8400 and 8800 MAN 0232 02 ...
Page 2: ......
Page 5: ...Table of Contents ...
Page 6: ......
Page 10: ......
Page 21: ...2 Installing the IP Application Switch Platform Installing and connecting the hardware ...
Page 22: ......
Page 28: ...Chapter 2 2 6 ...
Page 30: ......
Page 38: ...Chapter 3 3 8 ...
Page 40: ......
Page 48: ...Chapter 4 4 8 ...
Page 50: ......
Page 58: ......
Page 61: ...7 Understanding Platform Airflow Reviewing platform airflow information ...
Page 62: ......
Page 64: ...Chapter 7 7 2 ...
Page 66: ......
Page 72: ......
Page 78: ...Appendix A A 6 ...
Page 79: ...B Platform Specific Hazardous Substance Levels for China 8400 platform 8800 platform ...
Page 80: ......
Page 83: ...Glossary ...
Page 84: ......
Page 87: ...Index ...
Page 88: ......