MANUAL THERMOCOAGULATION - EVRF
Date
26/06/2018
Page 31 of 34
Revision N° : 18
Control of year 4
Date of control to carry out:
Date of control:
Checks carried out:
Visual check of EVRF.
Security control.
Control functions of orders.
Measuring of the output signals.
Control of the foot pedal.
Control of needle holder.
Control of output cables.
Changed components:
Needle holder.
Output cable.
Other components: @@@@@@@@@@@@@@@@@@@@@@@@
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@..
Name and visa of the controller
Name and visa of the customer: