Shut Down
Step 1:
Turn off pump and reduce engine RPM to idle for 3-5 minutes.
Step 2:
Turn off engine.
Step 3:
Open ball valve on test rig to drain. Remove expansion plug to drain hopper.
Step 4:
Remove test rig from outlet.
Step 5:
Replace expansion plug in hopper.
DAILY PRE-OPERATION CHECKS
EZG Manufacturing 1-800-417-9272
www.ezgmfg.com
Rev000 5/24/2022 18