Pumping unit
Ensure that the pumping unit is correctly secured to the front of the material hopper and all nuts tight and
secure.
Pay attention to the clamp nuts installed either side of the stator unit. Make sure they are tightened and
pinned securely.
NOTICE! Never run rotor stator dry.
Check that the drive shaft is correctly engaged into the UJ and that the socket is engaged over the head of
the rotor.
Check that the fasteners that hold the hydraulic motor to its mounting plate and the plate to the
hopper are secure.