background image

5

Initialization

An initialization should be carried out the very first 
time the bathtub is started up and after every power 
failure.

Should be performed after/when:

• 

First time start-up

• 

Power failure (power cut, disconnection from 
supply or shutdown)

Reason:
The initialization function (continuous movement 
monitoring) is designed with safety and the 
protection of the equipment/user in mind. The 
control switches off automatically if one of the 
actuators is working faster than the other one.

Process (Using Hand Control with Black 
Buttons):
Please press the DOWN key on the hand control 
to initialize the control mechanism. When you 
reach the lowest position, keep the DOWN button 
pressed for another 5 seconds. An audible tone will 
sound and the system is ready to be used.

Please do not hesitate do contact us if you have any 
further queries.

Instruction Manual

Using the Bath
Lower the bath to its lowest position to calibrate the 
actuators.

The drain plug closes (and opens) by turning the 
overflow valve.

Adjust the thermostat to the required temperature 
(see separate thermostatic mixer operating 
manual). Open the thermostat and test the water 
temperature by hand or with a bath thermometer

Fill the bath to the required level and close the 
thermostat.

Always check the water temperature by hand or a 
bath thermometer before the patient gets into the 
bath.

Lower the tub to the lowest position with the hand 
control allowing patient to step into the bath with 
assistance. Place the hand control back into its 
bracket at the back of the tub after use.
 The built-
in handles provide the patient with extra support.

When the patient is assisted into the bath with a 
lift system, the lifter must be positioned close to 
the side of the bathtub. The bathtub should be 
in a covenient working height and be adjusted by 
pressing the relevant button on the hand control. 
Place the hand control back into its bracket at the 
back of the tub after use.

Please make sure that the bathtub is lowered and 
raised evenly, both at the head and foot end of the 
tub. The tub must be level at all times. The patient 
must not use the bath if it is not level.

The foot support shall be removed before the lift 
stretcher is lowered into the water. It can be placed 
into the required position when a chair lift is used.

The shower handle is used to shower the patient and 
to rinse equipment after cleaning. Pull the diverter 
knob on the thermostat. This diverts the water from 
the bath filling spout to the shower handle. Always 
test the water temperature by hand to prevent 
patients from being scalded or shocked by cold/hot 
water.

After bathing, please proceed in reverse order.

Summary of Contents for Comfortline II

Page 1: ...01 Rev 7 30 18 EZ Way Comfortline II The Wellness Bath Operator s Instructions EZ Way Inc PO Box 89 Clarinda IA 51632 1 800 627 8940 www ezlifts com WARNING Cancer and Reproductive Harm www P65Warning...

Page 2: ...the back The maintenance hatch at the back can be removed for repair and maintenance work 2 The HiLo bathtub can be adjusted between 650 and 1000 mm 26 and 40 3 The three step adjustable foot support...

Page 3: ...and the thermostat and buttons are all working properly The warranty and liability expire automatically if modifications or repairs are carried out or if components are exchanged or opened without EZ...

Page 4: ...Music controls 7 Handles 8 Foot support slots 9 Drain plug 10 Thermostat with bathtub filling spout and shower 11 Shower handle 12 Hand control UP DOWN 13 Overflow drainage and control to open and clo...

Page 5: ...el and close the thermostat Always check the water temperature by hand or a bath thermometer before the patient gets into the bath Lower the tub to the lowest position with the hand control allowing p...

Page 6: ...may use your usual detergent to clean the bathtub Please make sure you have read the detergent supplier s instructions Daily Use of the Cleaning System 1 Remove the cleaning spray handle 2 from bracke...

Page 7: ...seconds starts at minimum capacity and is then turned up to maximum The LED 1 1 is flashing during waiting time LED Color Light System Option Use The light system touch control is located either at t...

Page 8: ...into the card slot 1 and put the lid to the control box back on The MP3 sound system is ready for use after the bathtub mains has been switched on again Autofill Option The Autofill allows staff to t...

Page 9: ...STAFF Movable components have to be maintained and inspected regularly because they are classified as wear parts e g motor fittings hoses connections pipe interrupters Inspection of electrical install...

Page 10: ...hing each button on the hand control INITIALIZIATION must be carried out if the tub does not raise evenly see separate instruction in the manual Check that the thermostat is working properly and test...

Page 11: ...11 Installation Drawing for HiLo Bathtub Comfortline II Floor drainage Open floor drain or HI pipe DN40 50 pipe coupling Wall drainage HI pipe DN40 50 pipe coupling Figure 9 Installation Diagram...

Page 12: ...PARTICULAR USE OR PURPOSE are expressly excluded EZ Way will not be responsible for any expenses inconvenience or incidental or consequential damages occasioned by the use loss of use or misuse of the...

Reviews: