background image

4

NBP 1200C • Setup Guide (Continued)

Step 3: Assemble AAP, Pass-through, and Power Modules

A variety of modules allow you to populate the Cable Cubby enclosure with a combination of AAPs, cable pass-through plates, 
retractors, or power modules. The NBP 1200C accommodates your choice of any two modules, allowing you to customize the 
device to meet your needs.

Assemble Connectivity Modules

The NBP 1200C ships with a single connectivity bracket that can be used with either the AAP frame plate or the cable grommet 
plate. Follow the steps below to assemble the connectivity modules of your choice before mounting them into the NBP 1200C.

NOTE:

  After assembling the modules, proceed to 

Step 4: Install Modules and a Retractor Bracket

 on the next page.

AAP module

The AAP module accommodates up to three  
single-space AAPs. Assembly procedures are shown in 
figure 2 at right, 

Cable pass-through module

The cable pass-through module accommodates up to 
eight AV cables. Assemble the cable grommet plate, and 
plugs in the module as shown in figure 3 at right.

Secure up to three 

single-space AAPs 

in the AAP plate.

Secure the 

AAP plate on 

the connectivity 

brackets using 

four of the 

provided 

module screws.

#4-40 Nut with 

Captive Washer

Insert cables through 

the bottom of the 

connectivity bracket. 

Connect cables 

to the AAPs.

1

3

2

Figure 2. 

Assembling the AAP Module

Secure the grommet plate 

on the connectivity 

bracket using four of the 

provided module screws.

2

Insert cables through the bottom 

of the connectivity bracket 

and into the holes 

of the grommet plate.
You may need to bend 

the plate gently to slide 

the cable past the 

slot opening.

Snap the included 

hole plugs into any 

unused holes.

1

3

Figure 3. 

Assembling the Cable Pass-through Module

Summary of Contents for NBP 1200C

Page 1: ...NBP 1200C and Other Devices in the System Step 10 Set up the NBP for Network Communication Step 11 Configure the System Step 12 Test and Troubleshoot Step 1 Get Ready Preparation checklist Use the fol...

Page 2: ...ingle connectivity bracket is provided It can be used with either the AAP frame plate or the cable grommet plate Step 2 Prepare the Installation Site Cut the Table or Furniture ATTENTION Installation...

Page 3: ...r acc der au connecteurs est soulign voir CNC Wood Router ci dessous Extron ne sera pas responsable des erreurs de coupe Ensure the table surface is at least 0 50 inch 1 27 cm thick Assurez vous que l...

Page 4: ...e accommodates up to three single space AAPs Assembly procedures are shown in figure 2 at right Cable pass through module The cable pass through module accommodates up to eight AV cables Assemble the...

Page 5: ...cable pass through module and power module Insert the modules into the cable cubby as shown in figure 5 NOTES Extron recommends mounting the power module on the left side of the enclosure For any cabl...

Page 6: ...rd The panel is attached to the lid with a hinge that allows access to the buttons without the panel becoming completely detatched You can now return the lid to the fully open position 5 5 From the fr...

Page 7: ...st the enclosure Lower the Cable Cubby into the hole to test the fit If necessary carefully enlarge the opening plastic m on f the e e ON OFF PC LA PTO P MUTE MED IA PL AY ER HDMI 1 HDMI 2 2 1 3 Figur...

Page 8: ...2 3 1 4 Figure 9 Installing Retractors Step 8 Install Cables in the Cable Cubby e ON OFF PC LAPTOP MUTE MED IA PL AY ER HDMI 1 HDMI 2 For cable pass through applications allow at least 36 inches 0 9...

Page 9: ...plex level autodetected Data rates 10 100Base T Power over Ethernet PoE The NBP receives power at this port Default login credentials Username admin Initial password unit serial number Password after...

Page 10: ...for the control device NOTE See the Toolbelt Help File Global Configurator Help File and Global Scripter Help File as needed for step by step instructions and detailed information The help file for GC...

Page 11: ...Volume LEDs Volume LEDs light to act as a meter to indicate the volume level NOTE There is no item F for this NBP model G Cable Cubby lid The lid tilts back to 130 Friction washers ensure the lid hold...

Page 12: ...ettings to factory default values without affecting user loaded files Reset to Factory Defaults Press and hold the Reset button for 9 seconds After the Reset LED blinks three times release and momenta...

Page 13: ...13 This page is intentionally left blank...

Page 14: ...st the system make adjustments finalize configuration Save the project Cable the NBPs and the control processor or HCR receiver then apply power Cable all devices Prepare the installation site Get rea...

Reviews: