Extron electronics EBP 108 RAAP Button Panel Setup Manual Download Page 8

8

EBP 108 RAAP Button Panel • Setup Guide (Continued)

EBPs that are relatively far from the control processor (see the 

eBUS Technology Reference Guide

 at 

www.extron.com

 for 

details) can be connected to an optional Extron PS 1220EB eBUS power inserter (see figure 7), or an Extron 12 VDC desktop 
power supply (see figure 8).

PWR OUT = 6W

V C G

VOL

POWER
12V      

1.0A  MAX

G

Tx Rx

RTS CTS

COM  1

3

1

2

4 G

DIGITAL I/O

G

Tx Rx

COM  2

-S

+V +S

G

eBUS

C

1

2

RELAYS

S G

IR/S

LAN

IPCP PRO 250

MAC: 00-05-A6-

XX-XX-XX

S/N:  #######    E######

Power Input

(100-240 VAC, 

50-60 Hz)

ATTENTION:

 

Do NOT connect the power 

pin to any device that is already powered 
by the IPCP Pro control processor or by 
an additional power supply.

eBUS 24 WATTS MAX

100-240V       50-60Hz

0.6A MAX

-S

+V +S

G

-S

+V +S

G

-S

+V +S

G

-S

+V +S

G

-S

+V +S

G

-S

+V +S

G

EBP  108  RAAP

M

S

B

L

S

B

BUS ID

1

ON

2 3 4 5 6

LINK

COM ERROR

ID ERROR

STATUS

RESET

POWER  LOAD = 0.5 W

+V +S -S G +V +S -S G +V +S -S G

+V +S -S G

eBUS DISTRIBUTION HUB

Ground

+

 Signal

+

12 VDC

-

 Signal

X

X

Ground

+

 Signal

-

 Signal

IPCP Pro

Power Input

(100-240 VAC, 

50-60 Hz)

PS 1220EB

ATTENTION:

 

Do NOT connect the power 

pin to any device that is already powered 
by the IPCP Pro control processor or by 
an additional power supply.

3/16"

(5 mm)

Max.

Tie drain wires

to ground.

EBP 108 RAAP

eBUS Connections

• Connect up to five eBUS 

endpoint devices to the PS 1220EB.

• Wire the connectors the same at 

both ends.

• All ports are identical and 

interchangeable.

Figure 7. 

Cabling an eBUS System with an PS 1220EB Power Supply and Distribution Hub

+

 Signal

-

 Signal

+

 Signal

-

 Signal

+

12 VDC

EBP  108  RAAP

M

S

B

L

S

B

BUS ID

1

ON

2 3 4 5 6

LINK

COM ERROR

ID ERROR

STATUS

RESET

POWER  LOAD = 0.5 W

+V +S -S G +V +S -S G +V +S -S G

+V +S -S G

eBUS DISTRIBUTION HUB

EBP  108  RAAP

M

S

B

L

S

B

BUS ID

1

ON

2 3 4 5 6

LINK

COM ERROR

ID ERROR

STATUS

RESET

POWER  LOAD = 0.5 W

+V +S -S G +V +S -S G +V +S -S G

+V +S -S G

eBUS DISTRIBUTION HUB

EBP  108  RAAP

PWR OUT = 6W

V C G

VOL

POWER
12V       

1.0A  MAX

G

Tx Rx

RTS CTS

COM  1

3

1

2

4 G

DIGITAL I/O

G

Tx Rx

COM  2

-S

+V +S

G

eBUS

C

1

2

RELAYS

S G

IR/S

LAN

IPCP PRO 250

MAC: 00-05-A6-

XX-XX-XX

S/N:  #######    E######

IPCP Pro

+

 Signal

-

Signal

+

Signal

-

Signal

+

12 VDC

EBP 108 RAAP

EBP 108 RAAP

Ridged

Smooth

3/16" (5 mm) Max.

NOTE:

  Check the polarity of the power

supply before connecting it to the EBP.

External Power Supply

(12 VDC, 1.5 A max.)

Ground 

all Devices

– Return

+12 VDC input

Tie drain wires to ground.

X

X

Ground

Ground

Figure 8. 

Cabling EBP Panels with an Extron Power Supply

figure 7

Summary of Contents for EBP 108 RAAP Button Panel

Page 1: ...figurator Plus and Professional GCP configuration software the Toolbelt utility software or Global Scripter programming software to configure the control processor Once configured the panels can be us...

Page 2: ...ith Global Configurator Plus and Professional or programming with Global Scripter see the software help file for more information C Volume Control LEDs and Rotary Encoder Use the encoder to adjust the...

Page 3: ...use a piece of sticky tape to pull it out of the button cap 4 Select one of the button labels from the printed label sheets included with the unit Remove the label from its backing and remove the cle...

Page 4: ...ff 22 4 3 Off 23 8 6 Off 20 1 Slide 1 2 3 4 5 6 ON M S B L S B BUS ID Figure 5 eBUS ID Setup Add the decimal numbers for each of the DIP switches that are set to On to obtain the address of the device...

Page 5: ...4 5 6 ON M S B L S B 0 0 0 1 0 0 4 1 2 3 4 5 6 ON M S B L S B 0 1 0 0 1 1 19 1 2 3 4 5 6 ON M S B L S B 0 0 0 1 0 1 5 1 2 3 4 5 6 ON M S B L S B 0 1 0 1 0 0 20 1 2 3 4 5 6 ON M S B L S B 0 0 0 1 1 0...

Page 6: ...6 1 2 3 4 5 6 ON M S B L S B 1 1 0 1 0 1 53 1 2 3 4 5 6 ON M S B L S B 1 0 0 1 0 1 37 1 2 3 4 5 6 ON M S B L S B 1 1 0 1 1 0 54 1 2 3 4 5 6 ON M S B L S B 1 0 0 1 1 0 38 1 2 3 4 5 6 ON M S B L S B 1 1...

Page 7: ...source are isolated from the devices powered by the second source by see figure 7 on the following page ATTENTION Always use a power supply supplied or specified by Extron Use of an unauthorized power...

Page 8: ...at is already powered by the IPCP Pro control processor or by an additional power supply 3 16 5 mm Max Tie drain wires to ground EBP 108 RAAP eBUS Connections Connect up to five eBUS endpoint devices...

Page 9: ...is receiving power but communication with the control processor is not confirmed Red LED Lights steadily when there is a BUS ID address conflict Green LED Lights steadily when power and communication...

Page 10: ...gure 1 on page 1 and see Step 5 Cable All Devices on page 7 6 Optional Connect cables to the AAPs Follow the instructions provided with the AAP 7 If you have not already done so set the DIP switches t...

Reviews: