background image

 

3

Cable Cubby Drawer CCD 220 and CCD 320 • Installation Guide (Continued)

Preparing the Table

Determine the best location to install the Cable Cubby Drawer

 

…

Ensure that the location where the Cable Cubby Drawer will be installed is convenient for the user.

 

…

Ensure that there is ample space under the table to allow for cable management. Reposition the cable track if 
space is limited (see 

Reposition Cable Track

 on the next page for instructions).

22.42"

(569.5 mm)

12.21"

(310.4 mm)

9.19"

(233.4 mm)

CCD 220 Top View

22.42"

(569.5 mm)

24.21"

(614.9 mm)

21.19"

(538.2 mm)

CCD 320 Top View

Summary of Contents for CCD 220

Page 1: ...ivity control and power Planning Check with local and state regulations before starting the installation Ensure that the planned installation complies with national and local building and electrical codes Ensure that the planned installation complies with the Americans with Disabilities Act or other accessibility requirements Check all parts and equipment before installation Ensure that all parts ...

Page 2: ...Cable Cubby Drawer CCD 220 and CCD 320 Installation Guide Continued 2 Application Diagram HDM I VGA AUD IO USB USB CHAR GER HD MI VG A AU DIO US B USB CHA RGE R Extron CCD 220 ...

Page 3: ...ere the Cable Cubby Drawer will be installed is convenient for the user Ensure that there is ample space under the table to allow for cable management Reposition the cable track if space is limited see Reposition Cable Track on the next page for instructions 22 42 569 5 mm 12 21 310 4 mm 9 19 233 4 mm CCD 220 Top View 22 42 569 5 mm 24 21 614 9 mm 21 19 538 2 mm CCD 320 Top View ...

Page 4: ... the cable track to the other side of the Cable Cubby Drawer Perform the same action as in Option 1 and remove the cable track bridge arm 1 Remove the three cable track screws located behind the cable track mounting U bracket 2 Remove the three nuts and washers holding the cable track in place U bracket 1 1 Option 1 Reposition the rear cable track by removing the fixed length cable track bridge ar...

Page 5: ...le Cubby Drawer CAUTION Wear safety glasses when operating power equipment Failure to comply can result in eye injury ATTENTION Portez des lunettes de sécurité lorsque vous utilisez l équipement électrique Ne pas respecter cela peut conduire à une blessure à l oeil The following instructions apply to both the CCD 220 and CCD 320 1 Align the included template the dimensions can also be found on the...

Page 6: ...rk the center of the holes and drill pilot holes 3 32 2 38 mm diameter 1 2 12 7 mm inch deep 22 01 559 1 mm 1 00 25 4 mm Table Edge 10 70 271 8 mm 12 21 310 1 mm 0 75 19 1 mm 1 00 25 4 mm 20 64 524 3 mm 1 00 25 4 mm 3 85 97 9 mm 12 35 313 8 mm Pilot drill 3 32 2 38 mm diameter holes 1 2 12 7 mm inch deep 12 places NOTE The diagram below is not drawn to scale Dimensions and templates are available ...

Page 7: ... 64 524 3 mm 22 01 559 1 mm 3 85 97 9 mm 0 75 19 1 mm 22 70 576 6 mm 12 35 313 8 mm CCD 320 Mounting Template Instructions 1 Align the template so that the Table Edge of the template is flushed with the edge of the mounting surface 2 Mark the center of the holes and drill pilot holes 3 32 2 38 mm diameter 1 2 12 7 mm inch deep TABLE EDGE Pilot drill 3 32 2 4 mm diameter holes 1 2 12 7 mm inch deep...

Page 8: ...ach the AAP modules to the AAP frame AAP frames allow you to populate the Cable Cubby Drawer with a combination of AAP modules Follow the steps below to assemble the connectivity modules of your choice HDMI VGA AUDIO USB USB CHARGER 3 Position the AAP modules through the front of the AAP frame 4 Secure the AAP modules with the 4 40 nuts included with the AAP kits Step 3 Install Populated AAP frame...

Page 9: ... Mounting a Power Supply to the CCD 320 Optional Place one or two power supplies behind the AAP modules as seen in the image below A power supply can be mounted in either location or orientation by lining up the mounting holes Step 5 Customize the Front Façade Optional Refinish paint or add veneer to the façade to complement the furniture or fabricate a new facade using the dimensions seen on the ...

Page 10: ...49 37 8 mm 0 20 5 0 mm R 0 49 1 3 mm R 0 49 1 3 mm R 0 49 1 3 mm R 0 59 1 5 mm 2X 125 20 16 512 0 mm 1 49 37 8 mm 0 20 5 0 mm R 0 49 1 3 mm R 0 49 1 3 mm R 0 49 1 3 mm R 0 59 1 5 mm 2X 125 CCD 320 Front View CCD 320 Side View Figure 1 CCD 220 and CCD 320 Front Facade Dimensions 1 Open the cable track by using the included tweeker to pry open the flaps Do this to the entire cable track 1 1 ...

Page 11: ...Check the drawer movement for any binding and adjust the mounting bracket position as required HD MI VG A AU DIO US B USB CHA RG ER 1 Install the included 8 wood screws in the pre drilled pilot holes leaving 1 8 inch 3 mm of space between the screw head and the table Hang the CCD 220 320 on the exposed screws through the CCD slotted mounting holes 2 Adjust the CCD left or right 9 32 7 14 mm on the...

Page 12: ...t location for the Cable Cubby Drawer Reposition the Cable Track if necessary Pre drill mounting holes for the Cable Cubby Drawer Preparing the Cable Cubby Drawer page 8 Disassemble the AAP frame from the Cable Cubby Drawer Assemble the AAP modules to the AAP frame Install populated AAP frame onto the Cable Cubby Drawer Mounting the power supply to the Cable Cubby Drawer Optional Customize the Fro...

Reviews: