Installation and Operation, cont’d
TLP 350CV • Installation and Operation
2-14
Connecting the TLP 350CV
The rear panel of the TLP 350CV located on the bottom of the enclosure, provides
all required connections. The panel requires an IP Link controller for operation.
POWER
12V
1.0A MAX
LAN
VID / Y
C
PREVIEW INPUT
a b
c
d
Figure 2-13 — TLP 350CV Rear Panel
a
Power Connector —
Connect the two pole, 3.5 mm captive screw connector
from the power supply (provided with the unit) to the power supply socket
on the rear panel. The power supply provides 12 VDC and 1.0 A.
W
Always use a power supply specified by Extron for use with the
TLP 350CV. Use of an unauthorized power supply voids all regulatory
compliance certification and may cause damage to the supply and the
TLP 350CV.
POWER
12V
1.0A MAX
LAN
VID / Y
C
PREVIEW INPUT
Ground
+12 VDC
External
Power Supply
(12 VDC, 1 A )
Orange Captive Screw
Connector
Tie Wrap
Figure 2-14 — Connect power supply
C
The power supply shall not be permanently fixed to the building structure
or similar structures.
The power supply shall not be located within environmental air handling
spaces or within a wall cavity.
The installation shall be in accordance with the applicable provisions of
the
National Electrical Code ANSI/NFPA 70, Article 725 and the
Canadian Electrical Code, Part 1, Section 16.
The power supply is to be located within the same vicinity as the Extron
A/V processing equipment in an ordinary location, Pollution Degree 2,
secured to the equipment rack within the dedicated closet, podium or desk.