•
T-bar maximum base thickness is 0.080” (2mm).
•
Ceiling tile must be flat all the way across.
•
Maximum ceiling tile protrusion allowed is 0.015” (0.38mm).
1 Remove the ceiling panels around the drop ceiling T-bar rail.
2 Open the movable sliding part of the T-bar to give the stationary and slider T-bar more space.
3 Hook the stationary end of the T-bar bracket onto the T-bar.
4 Tilt the T-bar up slightly in such a way that you are holding the stationary and movable sides of the
bracket. Squeeze the bracket parts together until you hear the T-bar locking tab click into place.
5 Slide the T-bar ceiling mount bracket base into the back of the access point. The locking tab fits into
a groove in the outside of the AP.
Figure 7: Attaching the AP unit onto the WS-MBI-DCFLUSH bracket
6 Hold the AP and rock it back and forth to ensure that it is securely mounted.
7 Attach the Ethernet cable’s RJ45 connector to the LAN1 port and place the ceiling tile back in place.
Mounting the AP using the WS-MBI-DCMTR01 Bracket
The optional WS-MBI-DCMTR01 (#30518) bracket can also be used for T-bar installations without the
mounting bracket.
Installation Process
ExtremeMobility™ AP505i FCC/WR
18