The device can be deployed as part of a VCS and IP fabrics. For advanced procedures to configure the device for VCS and IP fabrics,
refer to the
Network OS Management Configuration Guide
,
Extreme Network OS IP Fabrics Configuration Guide
, and the
Extreme
Network OS Command Reference
.
Items required
The following items are required for initial setup and verification of the device:
•
The device, mounted and installed with the required power supply and fan assemblies, transceivers, and cables; and connected
to a power source
•
A workstation computer with a terminal emulator application installed, such as HyperTerminal for Windows
•
An unused IP address with corresponding subnet mask and gateway address
•
A serial cable with an RJ-45 connector
•
RJ-45 to DB-9 adapter
•
An Ethernet cable
•
Access to an FTP server or USB device for backing up (uploading) or downloading the device configuration (optional)
Providing power to the device
Perform the following steps to provide power to the device.
1. Connect the power cords to both power supplies, and then to power sources on separate circuits to protect against failure.
Ensure that the power cords have a minimum service loop of 15.2 cm (6 in.) available and are routed to avoid stress.
2. For the VDX 6740, flip the switch on each power supply to
I.
For the VDX 6740T, the power supplies power up as soon as they are plugged in.
The power supply LEDs display green. The power LED on the front of the device turns green as well. The system status LED on
the front panel will be amber until POST completes and then it will turn green.
NOTE
Power is supplied to the device as soon as the first power supply is connected and powered
on.
3. After POST is complete, verify that the device power and status LEDs on the port side of the device are green.
Connecting an AC power cord
Use the supplied power cords. Ensure the facility power receptacle is the correct type, supplies the required voltage, and is properly
grounded.
Perform the following steps to connect to AC power:
1. Connect the power cords to both power supplies.
2. Route the cords so they will be out of the way when connected to the power source. Ensure that the power cords have a
minimum service loop of 15.2 cm (6 in.) available and are routed to avoid stress.
Items required
ExtremeSwitching VDX 6740 Hardware Installation Guide
86
9036108-00
Summary of Contents for ExtremeSwitching VDX 6740
Page 10: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 10 9036108 00...
Page 12: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 12 9036108 00...
Page 24: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 24 9036108 00...
Page 28: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 28 9036108 00...
Page 98: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 98 9036108 00...
Page 124: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 124 9036108 00...
Page 128: ...ExtremeSwitching VDX 6740 Hardware Installation Guide 128 9036108 00...