Hardware Installation
Altitude 300-2™ Getting Started Guide
33
padlock or a cable tie. The installer may now follow the standard instructions
for connecting the Ethernet cable, antenna shrouds for integrated antennas, and
the plastic cover.
WARNING!
The Altitude 300-2
™
is not secured to the bracket unless a padlock is used. If a
padlock is not used the unit should be secured to the bracket by a cable tie
through the lock hasp to keep it from falling. Failure to secure the unit is
hazardous.
Mounting on A Table or Shelf
The Altitude 300-2
™
can be installed on a table or shelf using the stick-on feet
supplied in the unit's kit. After the feet are applied, the unit is placed on the
horizontal surface and the powered Ethernet cable attached. If the unit is to be
locked a standard computer cable and lock can be used. The computer lock hole
is located at the rear of the Altitude 300-2
™
, see Figure 1: Rear View of Altitude
300-2i
™
on page 14. The antennas are installed and the antennas are adjusted
now for optimal performance. After that the plastic cover is attached, securing
the antennas and Ethernet cable.
Summary of Contents for Altitude 300-2
Page 6: ...6 Altitude 300 2 Getting Started Guide Figures...
Page 8: ...8 Altitude 300 2 Getting Started Guide Tables...
Page 12: ...12 Altitude 300 2 Getting Started Guide...
Page 34: ...34 Altitude 300 2 Getting Started Guide Hardware Installation...
Page 55: ...Reglatory Compliances Altitude 300 2 Getting Started Guide 55...
Page 56: ...56 Altitude 300 2 Getting Started Guide Reglatory Compliances...
Page 58: ...58 Altitude 300 2 Getting Started Guide Power Over Ethernet Connector Pin Assignments...
Page 62: ...62 Altitude 300 2 Getting Started Guide Terminology...