FALO’ 1CP - 2CP
ENGLISH
F
E
Step 8
Now, hook the 2 pre-assembled assemblies using the rod that
has been removed before.
Step 9
Place the 2 side tiles (G and H) tightening them slightly with
the screws and the ovalized washers pre-assembled on the
frame (the protruding part of the washers has to be turned
towards outside to allow the support of the upper tiles). Adjust
the central majolica (I) opening frontally the side elements
towards outside. Now, place the side tiles again and tighten all
screws moderately
H
I
G
N
L
M
O
Step 10
Lean the tiles (L and M) on the dome of the stove tightening
them to the hooking squares with the supplied screws. Then,
lean the 2 tiles (N and O) and the black painted cover on the
upper part.