background image

60 & 72 LZ and

AS 352,000-509,999

All XS, XP Below

600,000 & 60 AS 510,000–

789,9999 60 & 72 LZ

510,000-599,999

All LZ 600,000

—789,999

with Triton deck

All XS

Air-Cooled

600,000 & Higher

All XS

Liquid-Cooled

600,000 & Higher

All LZDS

312,000,000 &

Higher

Item

Description

Quantity

34

5/16-18 x 1 3/4
inch Hex Screw

4

4

4

5/16-18 x 2 inch
Hex Screw

4

4

35

5/16 inch Flat
Washer

4

4

4

36

5/16-18 inch
Whizlock nut

4

4

4

37

Nut, Nyloc Thin

2

38

Washer

1

1

1

39

Deflector plate

1

1

1

40

Plug

1

1

1

1

1

41

Weight Plate
Weldment

1

1

42

Weight Mounting
Plate

2

2

43

Hairpin

2

2

44

Drill Template

1

1

1

45

Spacer

6

Items 21, 22, 29, 30, 39, 44, & 45 not shown.

See Figure 17 for installation of items 29 & 30.

See Figure 16 for installation of item 39.

See Figure 8 for item 45.

4

 

Summary of Contents for ULTRA VAC UVD6672

Page 1: ...loc 10 24 inch 3 3256 61 Washer 3 32105 13 Screw HWH 10 24 x 3 4 inch 3 Assembling the tubes Literature Pack Manual Operator s Model Numbers UVD60 Fits Lazer Z LZ Lazer Z AS LAS Lazer Z XP Units 352 0...

Page 2: ...Drive Kit Lazer Z 605 Triton 600 000 Higher 109 1167 Drive Kit Lazer Z XS Air Cooled 605 Triton 600 000 Higher 109 1167 Drive Kit 109 1167 Drive Kit and Lazer Z XS Liquid Cooled 605 Triton 600 000 Hig...

Page 3: ...r Weight 2 2 2 2 2 12 Jackshaft 1 1 1 1 1 13 Blower Drive Belt 1 1 1 1 1 14 Frame Bracket RH 1 15 Frame Bracket LH 1 16 Frame Bracket 2 2 2 2 17 Mount Spacer 2 2 4 4 18 Mount Pin Weldment 1 1 1 1 1 19...

Page 4: ...16 18 x 1 3 4 inch Hex Screw 4 4 4 5 16 18 x 2 inch Hex Screw 4 4 35 5 16 inch Flat Washer 4 4 4 36 5 16 18 inch Whizlock nut 4 4 4 37 Nut Nyloc Thin 2 38 Washer 1 1 1 39 Deflector plate 1 1 1 40 Plug...

Page 5: ...99 Shown without ROPS for clarity Lazer Z XS Liquid Cooled Units Serial Number 600 000 and Higher and Lazer Z DS Serial Number 312 000 000 and Higher require an additional weight item 33 on the front...

Page 6: ...NING The engine can become very hot Touching a hot engine can cause severe burns Allow the engine to cool completely before service or making repairs around the engine area 2 Prior to installing the U...

Page 7: ...ine guard on liquid cooled units to the rear frame of the Lazer Z unit 3 Install the mount weldment item 9 loosely to the rear of the machine using the two bolts and nuts removed in step 1 4 Jack the...

Page 8: ...asher and whizlock nut These items are included with ROPS kit number FRPSLZ Note On 60 inch units the lower bolt on the wheel channel is best installed by positioning the nut behind the hole using a d...

Page 9: ...d with the nut to the inside of the roll bar Note Make sure the tab on the lanyard washer is installed as shown and points toward the front of the unit 6 Raise the roll bar into the upright position a...

Page 10: ...he key and wait for all moving parts to stop 2 Lower the deck fully Remove the right hand belt cover Remove the belt cover mounting stud that protrudes from the deck 3 Remove the deck drive belt from...

Page 11: ...to the top portion of the spindle shaft where the sheave mounts 8 Install the double sheave item 12 onto the right spindle shaft Install the spring disc washer and nut Make sure that the spring disc w...

Page 12: ...grove of the double sheave Install plug item 40 into bore of top sheave 9 Install deflector item 39 at the front right corner of deck as shown in Figure 16 Use carriage bolt nut and washer that retain...

Page 13: ...p the belt over the top deck spindle sheave 7 Install the plastic belt cover item 10 On 60 inch and 66 inch units the outside end of the cover is slotted and can slip between the two washers assembled...

Page 14: ...ial Number 439 999 and Lower with a ROPS 1 Install four weight plates behind the front panel and two weight mounting plates items 33 and 39 as shown in Figure 22 using four 5 16 18 x 2 inch screws fou...

Page 15: ...only fit with the ears located near the bend in the floor pan see Figure 25 Figure 25 Installing the Removable Weights Note The removable weights are heavy Use care when lifting them Make sure that yo...

Page 16: ...the holes here 8 Slip the upper end of the tube assembly into the hood opening Slide the lower end of the tube assembly over the blower outlet and align the notch with the tube latch Latch the tube to...

Page 17: ...ks to increase the force With the door closed both links should be slightly tight to minimize rattling 2 Door opening After adjusting the hinge links for door closing the handle link can be adjusted t...

Reviews: