3. Mechanical assembly
3.1 Installation
Description
It is important that the VEX is installed on a level surface, as this affects the col-
lection and draining of the condensate.
3.1.1 Installation directly on floor
The requirements for the floor surface must be met, see the section entitled "Re-
quirements for underlying surface".
NB
After installation, check the VEX unit is completely level.
3.1.2 Installation on mounting base
The EXHAUSTO mounting base enables the VEX unit to be installed correctly. The
base is equipped with adjustable levelling screws, so that the air handling unit can be
fitted horizontally on a surface that is not level ( +/- 20 mm per metre). See the sepa-
rate instructions for installing the mounting base.
3.2 Condensation outlet
Drain the condensation outlet into a floor gully or similar. The
condensation outlet must be fitted with a water trap. See below.
Risk of frost
Where there is a risk of frost: Insulate the condensation outlet
and protect it against frost - if necessary, using a heating cable.
3.2.1 Establishment of condensation outlet
Location
The following two drawings show examples of how the drain from the condensa-
tion outlet can be established and the correct dimensions for the water trap:
3005706-2017-06-08
Mechanical assembly
17/36
Summary of Contents for VEX100CF Series
Page 33: ...3005706 2017 06 08 33 36 ...
Page 34: ...3005706 2017 06 08 34 36 ...
Page 35: ...3005706 2017 06 08 35 36 ...
Page 36: ......