4.8.3 Installation of pigtails and test cable.
4.8.3.1 Insert the cable subsequently through the
compression gland, sealing block and rubber seal.
If the port is unused, please use the blanking plugs
provided.
4.8.3.2 Insert the cable(Φ2.0) together with the sealed
fixtures through the button pigtail port in the en-clo
sure.
4.8.3.3 Remove the jacket of the pigtail (about 60cm)
4.9.1 Route the sub units tube to each splice tray (max capacity: 12cores/one tray)
4.9.2 Fix the above sub units to the entrance of the splice tray by using the nylon ties and
route fibre to the splice area allowing extra length for reworking.
4.9.3 Repeat the same steps above.
4.9.4 Please embed the fibre splice protective tube subsequently into the deck.
Repeat the above steps until you meet your need of the cores. The max capacity of one tray is 12 cores (single fibre).
4.9.4.1 Fibre storing introduction
4.9 Splice fibres and store fibre
1. The fibres should be coiled in the big circle and its length is about 330mm.
2. when the fibres are coiled in the circle, with some length of fibres remained,
implant the spliced fibres with protective sleeves inside the fibre holder. If the
remaining fibre are not enough for a big circle, then coil the remaining fibres round
the small circle. The length of the small circle is about 220mm.