![Excel 208-504 Installation Manual Download Page 5](http://html1.mh-extra.com/html/excel/208-504/208-504_installation-manual_2449307005.webp)
4.6.2 Cable installation
4.6.2.1 Thread the fibre and thread it through the compression gland and two-port sealing ring.
4.6.2.2 Insert the cable clamp and secure.
4.6.2.3 Fix the strength member in position as shown below.
4.6.3 Cable sealing
4.7 For three hole Gland please follow the above instructions.
4.7.1 The components needed in the installation of cut cable
4.6.2.4 Store the spare cable in the closure
Be careful not to damage the fibre
Fasten the M6x30 bolts using the allen key provided.
Please fasten them carefully.
If the port is unused, please use the blanking plugs provided to seal the
unused ports.
Number
Name
Quantity
Material
Application
1
Base
1
PP
Fixing the internal and
external structure
2
Three-hole sealing ring
1
Rubber
For sealing the cut cable
3
Three-hole compression glands
1
ABS+PC
4
M6×30 hexagonal bolt
4
Stainless steel