Design and function
Intermediate hose package connection
099-005637-EW501
27.04.2021
21
5.2 Intermediate hose package connection
Figure 5-2
Item Symbol Description
0
1
Power source
2
Intermediate hose package
3
Intermediate hose package strain relief
> see 5.2.1 chapter
4
Connection thread - G¼"
Shielding gas connection (inlet)
5
14-pole connection socket
Wire feeder control cable
6
Quick connect coupling (red)
coolant return
7
Power source welding current connector plug
Welding current connection between power source and wire feeder
8
Quick connect coupling (blue)
coolant supply
• Secure hose package end with the strain relief
> see 5.2.1 chapter
.
• Push the welding current cable socket onto the “welding current connecting plug” and lock by turning
to the right.
• Screw the gas hose connection to the shielding gas connection (inlet) on the machine gas-tight.
• Insert the control cable plug into the connection socket (14-pole) and secure with crown nut (the plug
can only be inserted into the connection socket in one position).
Where applicable:
• Lock connecting nipples of the cooling water tubes into the corresponding quick connect couplings:
Return line red to quick connect coupling, red (coolant return) and
supply line blue to quick connect coupling, blue (coolant supply).