12
Figure 3.2 Photograph showing the installation of the fixed bed support
3.
Locate fixed flowcell into the tube unit and fix in place.
Leveling the 70mm, 100mm & 140mm Columns
After installation of the fixed flowcell and before installation of the adjuster unit, it is
recommended to level the column. This is achieved using the spirit level provided in the tool
kit and adjustment of the leveling studs located in the foot ring of the column.
1.
Place the spirit level on the tube flange and adjuster the leveling studs to ensure
column is level before proceeding.
There is approximately 30mm free vertical movement available whilst still maintaining a safe
amount of thread engagement.
Summary of Contents for 100
Page 1: ...70mm 100mm and 140mm Chromatography Columns ...
Page 44: ......