WATER TESTING THE QUARTZ, O-RINGS AND LOCKING NUTS
Now that the unit is in position and connected to pipework, the quartz sleeve and
O-ring at each end can be leak tested to ensure that they have been fitted properly.
Failure to test for leaks and improper installation at this stage may cause water to
seep into and damage the bulb socket and end cap sealing ring.
STEP 1:
Fit quartz sleeve, o-rings and
locking nuts.
STEP 2:
Check the locking nuts are hand
tight only.
STEP 3:
Position and mount UV and
connect to pipework.
STEP 4:
Turn on pump and pump water
through unit.
STEP 5:
Check locking nuts for signs of
water leaking.
STEP 7:
If no water leaks, quartz sleeve has
been properly installed. Proceed to connection
to the electricity supply.
STEP 6:
If water seeps from locking nuts,
revisit installing the quartz sleeve on page 6.
Failure to test for leaks and
improper installation at this
stage may cause water to seep
into and damage the bulb socket
and ballast. Water damage from
improper installation is
NOT
covered under warranty.
WARNING
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
EQUAL AMOUNTS MUST BE VISIBLE
10
Summary of Contents for evoUV
Page 19: ...19...