6.9 Instructions for the disposal of the packaging material
The four-sided wooden frame consists of untreated, raw wood.
Special country-specific import regulations may also stipulate the use of wood which
has been treated against pests.
The plastic sheeting (PE sheeting) may be recycled.
The cardboard packaging material used to protect the edges can also be recycled.
The steel tensioning strap made of strip steel may be recycled with the steel scrap.
The plastic tensioning strap of plastic (PP) can be recycled.
7 Settings for initial commissioning by the service engi-
neer
7.1 Commissioning
In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers must be carried out. More
detailed information, if required, can be found in the relevant Instructions for Use.
ATTENTION!
The installation may only be commissioned by suitably qualified persons observ-
ing the safety instructions.
Before initial startup, check that any tools and parts not belonging to the installa-
tion have been removed.
Check whether any escaping liquid is removed.
Activate all the safety systems and door switches before commissioning
Check that all screw connections are tight.
Please also read the chapter on “General safety instructions ".
Commissioning and instructions will be provided by technicians specially trained
by Meiko. The operator may only use the installation after training has been pro-
vided.
8 Washing with dish-washer
The appliance must not be used without a thorough knowledge of the ”Operating In-
structions“. Incorrect operation could result in injuries to personnel or damage to the
appliance.
8.1 Operating panel
Illustration 1; Operating panel
Program is running
Program is running
appliance is switched on
Program start key
“Off” key
Temperature display tank / boiler,
Fault display
Information display
Code display