1. Attach the Upright Posts
1-1. Attach the Left Upright Post
Ask some one to help you hold the
r
Left Upright Post Assembly (2)
in front of
the
Left side Main Frame (1)
closely.
Attach the
r
Left Upright Post (2)
to the
front end of the
left side Main Frame (1)
with
four M8 x 60mm Allen Head Bolt (10)
with finger tight in position firstly and then
secure with the 6mm Allen Key.
FIXINGS:
FIXINGS:
x
4
Part
No.
10
Take Care to ensure
the wires & cables are
connected as tightly as
possible, Slide the rest of
the connect wires & cables
into the right upright post
before the Right Upright
Post attachment.
!
Make sure the bolts are fully
tightened with the allen key.
!
1-2. Attach the Right Upright Post
Ask someone to help you hold the
r
Right Upright Post Assembly (3)
in
front of the
right side Main Frame (1)
closely.
Hook the inner tension cable together as shown ( you may have to pull
r
the outer tension cable firmly, to hook the upper cable into the bracket
of the lower cable)
Connect the
r
Middle Section Wires ( 2 pins & 3 pins ) (15/17)
and
Sensor Wires ( 2 pins & 3 pins ) (14/16)
together accordingly and
tightly.
Slide the rest of the connect wires & tension cables into
r
the
Right Upright Post (3)
firstly and then attach the
Right Upright
Post (3)
to the front end of the
ri ght side Main Frame (1)
with
four M8 x 60mm Allen Head Bolt (10)
with finger tight
in position firstly and then secure with the 6mm Allen Key.
FIXINGS:
TOOLS:
6
FIXINGS:
FIXINGS:
x
4
Part
No.
10
FIXINGS:
TOOLS:
Tension
Cable
1.
2.
3.
4.
Summary of Contents for DE ARUN100