INSTALLATION
FLUE OUTLET
Flue
duct
support
Vertical connector
90
o
elbow
45
o
elbow
Roof Flue Extentsion Duct
nm8810
Flue Terminal
Flue Seal Collar - Flat Roof
Flue Seal Collar - Tile Roof
29 ROOF FLUE KIT CONTENTS / OPTIONS
28 FITTING THE OPTIONAL ROOF FLUE KIT (Flat or Pitched)
nm8736
Note.
A flat or pitched roof flashing plate (not supplied) is required before
proceeding with the installation of this kit.
This kit is suitable for both flat and pitched roof terminations, using a
concentric flue to run vertically from the top of the boiler and terminating
above roof level.
Connection to the top of the boiler is made using both a separately
supplied vertical connector and a 80/125 adaptor.
WEATHER PROOFING
Where the flue passes through the roof line an
adequate seal must be made. This is achieved
by using either:
-
Flat roof weather collar
or
-
Universal weather collar.
ACCESSORIES
Flue Duct Extension Kits are available for
flue lengths extending beyond 1m. These
packs contain 1m extension ducts and
may be cut to the desired length.
If the offset vertical option is used an elbow
Kit is required. For a full accessories list
refer to page 7, Optional Extras and Frame
31, Flue Arrangement.