
218
POWERHEAD
POWERHEAD ASSEMBLY
Apply a 1/16 in. (2 mm) bead of
RTV Adhesive
around each water passage on the block and cyl-
inder head as shown (13 locations).
Install cylinder head with the thermostat toward
the top. Apply outboard lubricant to threads and
install the cylinder head screws. DO NOT use any
sealant on threads
Following sequence on cylinder head, tighten all
screws in stages to a torque of 168 to 192 in. lbs.
(19 to 21.5 N·m).
Crankshaft and Connecting
Rod Installation
Rotate cylinder block so crankcase mating flange
is facing up.
Apply
Gasket Sealing Compound
to lower oil seal
groove in cylinder block. DO NOT put any sealer
in upper seal groove.
Check that main bearing alignment dowel pins are
seated in the block.
Push all pistons to the top of cylinders. Remove
numbered connecting rod caps.
Gently lower crankshaft into place.
•
Align tab on lower bearing seal housing with
hole in crankcase.
•
Align upper oil seal in groove.
•
Locate each main bearing on its dowel pin. A
mark placed on the bearing race opposite the
1.
RTV sealant
2.
Thermostat seal
002272
1.
Cylinder head screws (14 total)
002253
2
1
1
1
1
1.
Gasket Sealing Compound
2.
Dowel pins
3.
No sealer here
002262
1
2
3
Summary of Contents for E-TEC E40DPLSCB
Page 1: ......
Page 2: ......
Page 230: ...228 POWERHEAD POWERHEAD VIEWS POWERHEAD VIEWS Port Short Block Starboard Short Block...
Page 231: ...229 POWERHEAD POWERHEAD VIEWS 11 Port Dressed Powerhead Starboard Dressed Powerhead...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Rope Start Models Starboard Rope Start Models...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top...
Page 236: ...234 POWERHEAD POWERHEAD VIEWS Top Rope Start Models...
Page 310: ...308 TRIM AND TILT ADJUSTMENTS ADJUSTMENTS Refer to Trim Sending Unit Adjustment on p 62...
Page 322: ...S 2...
Page 369: ......