112
SYSTEM ANALYSIS
IGNITION OUTPUT TESTS
Running Ignition Tests
Use
Evinrude Diagnostics
Software to monitor
system voltage (55 V).
•
Voltage readings at a specific speed (RPM)
should be steady.
•
Refer to
Use an inductive timing light to monitor the spark
signal through each of the secondary circuit
(spark plug lead) wires.
Start outboard and observe timing light strobe.
Look for a consistent flash and only one flash per
revolution. The strobe of the timing light should be
the same for each cylinder.
Results:
Steady voltage and strobe, engine misfires:
•
Inspect or replace spark plugs
•
•
Inspect for internal engine damage.
Steady voltage, erratic strobe, engine misfires:
•
Inspect or replace spark plugs
•
Check CPS air gap and resistance.
•
Ignition Control Circuit Tests
•
Voltages fluctuate, engine misfires:
•
Inspect battery and connections
•
Test capacitor and all ground connections.
•
•
Ignition Control Circuit Tests
•
IMPORTANT:
If a running problem occurs at
about 1200 RPM, the outboard may be in
S.A.F.E.
Refer to
1.
Timing light pick-up
2.
Spark plug lead
006492
1
2
Summary of Contents for E-TEC E40DPLSCB
Page 1: ......
Page 2: ......
Page 230: ...228 POWERHEAD POWERHEAD VIEWS POWERHEAD VIEWS Port Short Block Starboard Short Block...
Page 231: ...229 POWERHEAD POWERHEAD VIEWS 11 Port Dressed Powerhead Starboard Dressed Powerhead...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Rope Start Models Starboard Rope Start Models...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top...
Page 236: ...234 POWERHEAD POWERHEAD VIEWS Top Rope Start Models...
Page 310: ...308 TRIM AND TILT ADJUSTMENTS ADJUSTMENTS Refer to Trim Sending Unit Adjustment on p 62...
Page 322: ...S 2...
Page 369: ......