14
ENGLISH
9.2.5 POSITIVE HARD CHILLING WITH CORE PROBE and subsequent storage
The chilling cycle with core probe and subsequent storage consists in three phases:
►
1st phase: Hard chilling cycle
(Room temp. setpoint -20°C; Core probe temp. setpoint 15°C)
►
2nd phase:
Soft chilling cycle
(Room temp. setpoint 0°C; Core probe temp. setpoint 3°C)
►
3nd phase:
Storage
(Room temp. setpoint 2°C)
After completing a phase, the blast chiller automatically switches to the next one.
- Make sure the blast chiller is in “ON/STAND-BY” mode, that the keyboard is not locked (chapter
11) and that no procedures are being carried out.
►
Press and release the
key
the
icon starts flashing.
►
Press and release the
key
the
HARD
and
icon flash
The display shows the working setpoint during the chilling.
►
It is possible to use the
keys to modify this value.
►
Press and release the
key within 20
seconds
the
,
HARD
and
icon remain
on, and a one-minute test is carried out, to
make sure the core probe has been correctly
inserted:
►
If the test has a positive outcome, the chilling
cycle with core probe starts.
►
If the test has a negative outcome (e.g. core
probe not inserted), the acoustic buzzer warns
us 3 times (each 10 seconds) that the core
probe has not been inserted. In this case there
is no need to press any keys, after 30 seconds
automatically begins a time-based cycle.
During the chilling cycle, the display shows the temperature detected by the core probe, and
the
icon is on.
►
It is possible to display the room’s temperature in any moment, pressing and releasing the
key.
►
To restore the standard display mode, press and release the same key or do not operate for
15 seconds.
►
Once the chilling cycle has been carried out, the blast chiller automatically switches to a
storage cycle.
►
During the storage, the display shows the temperature detected by the room probe and the
icon is on.
►
To stop the cycle, press the
key.