Forced circulation solar systems Model BL 1
(without a helping source of energy - central heating boiler)
Forced circulation solar systems Model BL 2
(with a helping source of energy - central heating boiler )
26
Attention: A safety pressure releaf valve is mandatory in the cold inlet of a tank.
NOTE: The above drawings are typical drawings of basic principles. You must always consult a specialized engineer for your own installation
1. Solar collectors
2. Storage tank (boiler)
3. Hydraulic kit
4. Expansion vessel
5. Differential Thermostat
6. Circulator for recirculation of
hot water (optional)
7. Cold water inlet
8. Non return / safety valve
9. Mixing valve
10. Central heating system
1. Solar collectors
2. Storage tank (boiler)
3. Hydraulic kit
4. Expansion vessel
5. Differential Thermostat
6. Circulator for recirculation of
hot water (optional)
7. Cold water inlet
8. Non return / safety valve
9. Mixing valve
Summary of Contents for 1000/BL1
Page 1: ......
Page 12: ...CLIMATIC DATA OF SELECTED WORLD CITIES 12...
Page 13: ...Energyoutputofthecollectorinseveralcitiesoftheworld inkWh m2 13...
Page 30: ...Assembly diagram of the support base for one 30...
Page 34: ...Assembly diagram of the support base for three 34...
Page 37: ...Connectionofcollectorsandaccessories 37...
Page 39: ...HYDRAULIC KIT 39...