background image

 

41

 

 
 

The solar system can operate at extremely high temperatures. Please do not attempt 

to decommission the system yourself, as there is a risk of serious injury.

 

 

There is also a risk of electrocution from 240VaC electricity.

 

 

1. Always wear appropriate Personal 

Protective Equipment such as gloves 
and eye protection. 

2. Even if the pipework near the cylinder 

seems cool, the panels can be at high 
temperature. Decommissioning should 
therefore only be attempted when there 
is no solar input, or the panels should 
be covered with light proof covers and 
left for at least 5 hours. 

 

 

3. Turn off the switched fused spur and 

remove the fuse. Leave the fuse holder 
open and use a padlock or similar to 
lock it open. Leave a conspicuous sign 
stating the power should not be recon- 
nected. 

4. Connect a short length of hose to the 

drain point situated at the lowest point 
of the system and place in a suitably 
sized container 

– do not drain into the 

public sewerage system. Antifreeze 
liquid must be disposed of correctly. 

5. Open the check valve. 
6. Slowly open the drain tap. When the 

initial low created by pressure has 
stopped, open the air-vent at the top of 
the solar panels. 

7. When  the  luid  has  inished  draining, 

disconnect the pipework starting at the 
upper part of the system. Caution 

– 

there may still be luid in the pipework. 

8. Dispose of any materials correctly. 
9. Panels should only be removed by 

qualiied  professionals  using appropri- 
ate access and safety equipment. 

 

The law requires employers to appoint one or more competent persons to assist them in identifying and implementing 
the preventive and protective measures required. 

 

Maintenance schedule

 

TO BE SIGNED ON Completion OF Commissioning

 

 

Date of site visits for bacterial, water 

………………………………………………………………

 

Quality and access risk assessments. 

 

Commissioned by. 

………………………………………………………………

 

Competent persons scheme unique 
identification  number. 

………………………………………………………………

 

On behalf of. 

………………………………………………………………

 

Date system commissioned and 
Handed over. 

………………………………………………………………

 

Signature of commissioning engineer. 

………………………………………………………………

 

Signature of user to confirm 
receipt and understanding 
(optional). 

………………………………………………………………

 

 

Maintenance log

 

 

Date: 

Name of engineer/company: 

Date: 

Name of engineer/company: 

Date: 

Name of engineer/company: 

 

Summary of Contents for 1000/BL1

Page 1: ......

Page 2: ...dren We live in times with great ecological problems Planet Earth is sounding the alarm of ecological danger The thoughtless use of mineral energy sources is resulting in increased pollution of the at...

Page 3: ...ipheral accessories Basic Accessories Page 23 Peripheral accessories Optional Accessories Page 24 Solar Systems Forced circulation systems Models Page 25 Typical installation diagrams Page 26 Installa...

Page 4: ...the sun radiation of each area and the size of the system Simple The well studied selection of materials of Everhot make Its Installation safe and easy reducing the time needed for Its Installation to...

Page 5: ...e protected during their Transport with 4 plastic elbows of hard plastic 3 Cardboard box with all of the accessories except pipes and wires which are required for the installation of the system like h...

Page 6: ...g machine and the dishwasher we would have to increase the calculated daily needs of consumption as follows Washing Machine 20 liters day 1 wash per day Dishwasher 20 liters day 1 wash per day Example...

Page 7: ...ser The information of the above table can also be used in combinations so that in every case the average daily consumption can be properly calculated In the case that a recirculation system exists fo...

Page 8: ...ntral heating boiler in the case where the above mentioned circumstances do not exist the storage tank can heat up from secondary source of energy for example central heating boiler This occurs throug...

Page 9: ...ool and 40mm rock wool minimize Thermal losses in areas with low seasonal temperatures Special prismatic glass resistant to hale solar tempered glass Absorber made from one unique sheet absorber with...

Page 10: ...Back insulation 35 40 mm insulation Side insulation 20 mm glass wool Cover Material solar tempered glass Thickness 4mm Water tightness joint EPDM and transparent silicone Total thermal efficiency 95...

Page 11: ...45 C and 40 C For every day of the month the efficiency of the collector is calculated where the maximum efficiency and the heat losses of the collector are taken into account depending on the existi...

Page 12: ...CLIMATIC DATA OF SELECTED WORLD CITIES 12...

Page 13: ...Energyoutputofthecollectorinseveralcitiesoftheworld inkWh m2 13...

Page 14: ...IES OF THE WORLD in KWh m2 in temperature 40 C Collector ST 2000 selective Base of results Test of DEMOKRITOS GREECE Collector ST 2000 selective Base of results Test of DEMOKRITOS GREECE Collector ST...

Page 15: ...f each installation Example For one system 300 E BL1 with 3 collectors ST 2000 in a parallel connection total surface area 6 30m2 we can choose a medium flow rate of 60lt h per square meter of install...

Page 16: ...ectric resistance 2 9 KW Available with one or two tube heat exchangers suitable for every Application Upon a special order buffers can be delivered 150lt 1000lt models BL0 without a tube heat exchang...

Page 17: ...namel Food grade enamel quality applied with a double direct method and baked at 850 C BUFFER tanks are excluded Extra corrosion protection is offered by magnesium rods that must be checked and replac...

Page 18: ...940 350 675 900 1150 315 567 850 982 Thermal losses Kwh 24H 2 24 2 68 model Bl 500 Bl 800 Heat Exchangers Solar lower Heat Exchanger Bl1 models Back up Heat Exchanger Bl2 models Solar lower Heat Excha...

Page 19: ...it Rugged design Cost effective installation and filling Multi functional ball valve which greatly simplifies the filling and draining of the system Collector and reservoir sections can be separated f...

Page 20: ...ions If the handle is pointing in the direction of flow the system medium can circulate An integrated check valve stops osite direction and also acts as a gravity brake right closes the ball cock in t...

Page 21: ...am Vent pipe Painted steel Valve housing components Brass Internal components Stainless steel brass and plastic Sight glass Boric silicate O ring seals EPDM Flat seals with high temperature resist anc...

Page 22: ...perature difference controller for the various system variants Depiction of graphics and texts in a lighted display Simple viewing of the current measurement values Analysis and monitoring of the syst...

Page 23: ...If the total length of the closed circuit is over 100 m with a 22mm pipe then it is recommended to use a bigger expansion vessel the general rule for choosing an expansion vessel is 10 of the total v...

Page 24: ...at 6 or 9 kW 3 400 V without thermostat Thermostat All of the single phase electric resistances up to 4 kW are delivered with a thermostat with a uni polar interruption function as well as a bi polar...

Page 25: ...150 1 2 61 150 BL1 M 150 1 2 10 200 BL1 200 2 2 x 2 10 200 BL1 M 200 1 2 61 300 BL1 300 2 2 x 2 61 300E BL1 300 3 3 x 2 10 300 BL1 M 300 2 2 x 2 10 420 BL1 420 3 3 x 2 10 420E BL1 420 3 3 x 2 61 500 B...

Page 26: ...s You must always consult a specialized engineer for your own installation 1 Solar collectors 2 Storage tank boiler 3 Hydraulic kit 4 Expansion vessel 5 Differential Thermostat 6 Circulator for recirc...

Page 27: ...ll this alternate equipment always under the concurrent opinion of the customer 8 For installation on an inclined roof the D plates must be screwed with the appropriate screws and nuts on the roof tim...

Page 28: ...ers or on the concrete of the roof D 1180 mm D 1220 mm For support bases with 1 2 collectors For support bases with 3 collectors Screw tightly the rectangular frame A C or E onto the plates D Level th...

Page 29: ...Installation Instructions Support base for 1 collector ST 2000 or ST 2500 p 30 31 Support base for 2 collectors ST 2000 or ST 2500 p 32 33 Support base for 3 collectors ST 2000 or ST 2500 p 34 35 29...

Page 30: ...Assembly diagram of the support base for one 30...

Page 31: ...collectorST2500onaflatorinclinedsurface attention the plate a is connected to the plate B exactly as shown in the detailed 31...

Page 32: ...Assemply diagram of the support base for two attention for the installation of two collectors on a tiled roof the plates C are installed in the middle hole of the plates a 32...

Page 33: ...collectors ST 2500 on a flat or inclined surface attention the plate a is con nected to the plate B exactly as shown in the detailed diagram 33...

Page 34: ...Assembly diagram of the support base for three 34...

Page 35: ...Collectors ST 2500 on a flat or inclined surface Attention In the installation of the support base with three collectors on a tiled roof the three plates C are not used 35...

Page 36: ...ed to the outlet on the highest point of the collector s as shown in the photo In order to achieve the best contact between the the sensor and the sensor socket use thermal conductive material before...

Page 37: ...Connectionofcollectorsandaccessories 37...

Page 38: ...pump from the hydraulic kit The functioning pressure between 1 5 and 3 bar can be achieved with the pressure pump or the pressure of the water supply We constantly check all of the points of degassing...

Page 39: ...HYDRAULIC KIT 39...

Page 40: ...installation of the unit The technical characteristics can change without prior notification If your Solar Collector will be stagnant in the sun for an extended period of time you should cover the co...

Page 41: ...system Antifreeze liquid must be disposed of correctly 5 Open the check valve 6 Slowly open the drain tap When the initial low created by pressure has stopped open the air vent at the top of the sola...

Page 42: ...stallation of the system should be per formed only by authorized installer Collectors shouldbecoveredduringinstallation forexam plewiththesamecoverusedfortransportation The collectors will be filled w...

Page 43: ...lling with pump YES NO Electric characteristics adjustment of differential thermostat Model of Differential Thermostat Adjustment of maximum temperature for the protection of the boiler C Adjustment o...

Page 44: ...the leaking of liquid or thermal fluid water Is there a safety valve connected Is there an indication of the make and type of thermal liquid on a label installed in a viewable area DIFFERENTIAL THERM...

Page 45: ...SPECIAL QUALITY INSPECTION IDENTIFICATION BADGE that certifies IT S QUALITY IT S PERFORMANCE IT S DESIGN 46 1 Conference room 2 Design of products moulds 3 Automatic welding machine of the storage ta...

Page 46: ...systems throughout the world contributing to the ecological protection of the environment on a daily basis Some of the countries where mEGaSUN is successfully exported Germany Italy France Spain Cana...

Reviews: