COMMISSIONING
WARNING Electrocution
Commissioning may only be carried out by a qualified contractor
in accordance with safety regulations.
IInitial start-up
Either open the DHW valve of the tap or set the mono lever mixer tap to “hot”
until the water that flows out is free of air bubbles.
Switch on power at the fused spur.
Select a temperature.
Check the entire hydraulic installation for tightness.
Note
If you fail to follow the correct sequence (first water, then power),
the high limit safety cut-out will trip.
Proceed as follows:
Disconnect the appliance from the power supply.
Fill the appliance with water.
Connect the appliance to the power supply.
Appliance handover
Explain the functions of the appliance to the user. Show the user how to
operate the appliance.
Make the user aware of potential dangers, especially the risk of scalding.
Hand over these instructions and, if applicable, the instructions for any
accessories.
13