10
4.Installation
4.1. Safety precautions
Please keep the vertical direction when installing and carrying, or may result in the damage
of the equipment.
Please make sure the installing place could stand the weight of the equipment.
Please install in the place that not liable to shake violently.
Avoid installing in the environment with acid fog, or may result in strong corrosion of
components, wire and cabinet.
Avoid installing in the high temperature and high humidity environment and direct sunlight.
Good ventilation condition and installing air-conditioning if possible.
Making sure that the inlet cable and power grid capacity could make the equipment work at
full capacity regularly.
4.2 Installation instructions
When taking out the controller cabinet from the packing box, please open the front and
back door to check the nameplate whether the charger specification in line with the order
form and the cabinet has no apparent damage. Removing the fixed screw and holder to
check whether each component and wire loose or short out or not.
The equipment shall be installed vertically. The max. incline angle shall be less than
50.Making sure that the place for the equipment is enough. Cooling air could move from the
bottom and outgo from the top.
The equipment must be installed in ventilated situation. Keep the around distance of the
equipment more than 0.5 meters. The ambient temperature could make big difference to
the service life of the equipment. When installing, the ambient temperature shall not over
the rated range. Please avoid the high temperature, high humidity and the place with direct
sunlight.
Please choose the suitable input and output wire according to the electric atlas provided by
the equipment.
Making sure that the power grid has sufficient input power according to the power
parameters provided by the equipment.
5. Operating instructions
5.1 Panel display and description.
The control cabinet panel of the charger is schematic, as showed in the figure 5-3.