![EVERDIGM EPG05 Operation & Maintenance Manual Download Page 19](http://html1.mh-extra.com/html/everdigm/epg05/epg05_operation-and-maintenance-manual_2442768019.webp)
- 19 -
Step 2 :
Arm
Link
Mounting Adapter
Stopper
Mounting Pin
Grab
Figure 14
Move the shovel cylinder and align the hole of carrier link with that in the mounting adapter in the same
way as the Step 1.
DANGER!
When aligning the pin holes, never insert fingers into the pin holes or the inner space of the
linkages. Unexpected movement of carrier may cause a server injury.
Match the holes by only visual lining up. While moving the carrier, make sure that there is no
person in the vicinity of the carrier.
Personal injury can result also from dropping the mounting pins during the installation work.
Wear safety shoes to protect feet.
Step 3 :
Remove the end caps from the connection ports on the grab and the stop valves on piping line, then
connect the main port and rotation port each other with proper hydraulic hoses.
The connecting threads must be undamaged and clean from sands, water, etc.
Open the stop valves on piping line.
Summary of Contents for EPG05
Page 36: ...36 Notes...
Page 37: ...37 Notes...