![Ever Power Systems POWERLINE RT PLUS 10 000 Installation Manuallines Download Page 4](http://html1.mh-extra.com/html/ever-power-systems/powerline-rt-plus-10-000/powerline-rt-plus-10-000_installation-manuallines_2442579004.webp)
Installation guidelines for the POWERLINE RT PLUS 6-10 kVA units
2020-03-26 16:15
, tel.: +48 61 6500 400
4
strength of the installation location.
The base structure must prevent collapsing under the device weight.
Do not cover any ventilation openings of the device.
Ensure proper ventilation of the room where the batteries are installed (this also
applies to units with integrated batteries).
CAUTION!
Required air flow venting room
Q = 0,013 * C [m3/h] C - capacity in Ah
C)
Power supply and receiver systems
The systems shall be designed and erected only by properly licensed and
qualified personnel.
CAUTION!
The user shall ensure that the electrocution protection
system meets the applicable requirements of local laws.
CAUTION!
Do not connect the PE line to the UPS with copper cable
tips.
The power supply and receiver lines of the UPS shall be isolated.
It is recommended to specifically mark/label the connection outlets to distinguish
those of the isolated UPS network from the mains system outlets.
Connect the UPS to the nearest mains switching board with copper wires in
reinforced shields (e.g. coated cables) or assure an equivalent level of
mechanical protection by applying other engineering measures (e.g. cable trays
or pipes).
CAUTION!
Only the Authorised Technical Service may connect the
device to the system and commission it. Otherwise the warranty shall be
void.
The selection of safeguards, wire sizes and disconnector and isolation devices for
installation at the UPS switching room are shown in the installation guidelines
tables.
It is recommended to install an external bypass system (for the service bypass)
Summary of Contents for POWERLINE RT PLUS 10 000
Page 1: ......