2.3
Preparing Installation
Before installing UOW2000 Series for outdoor application or
hard-to-reach location, we recommend configuring and test all the
devices first.
For configuring the UOW2000 Series, please follow the quick steps below
to power up the UOW2000 Series. Refer to Figure 2-4 for steps 1
through 5.
Figure 2-4
Step1 : Connect the DC plug of the AC/DC power adapter into the DC
Input Port of Inline Power Injector and the wall-mount plug into a
power outlet or power strip (refer to
). The Power LED on the
Inline Power Injector will light up.
Step2 : Run the cross-over type uplink Ethernet cable from Data Input
Port (refer to
) to the Ethernet port on a PC.
Step3 : Connect the 30m CAT 5 Ethernet cable into the UOW2000 Series
unit. Hand tighten the connector.
Step4 : Connect the remaining end of the 30m CAT 5 cable into the PoE
labeled AP/Bridge. This is the power side of the PoE that will power up
the UOW2000 Series.
When the UOW2000 Series receives power over the Ethernet cable, the
UOW2000 Series will start its boot up sequence and the Active LED on
the Inline Power Injector will light up.
You can configure the UOW2000 Series via HTML browser, such as
Microsoft Internet Explorer or Netscape Navigator from a remote host or
PC.
9