11 Product installation and power supply
BoltGATE 20-31 User's manual EN
11.1
Introduction
The product is intended for professional use and must be installed by qualified personnel only.
The product must be installed in a secured location, accessible to authorized personnel only
(for example in a cabinet / technical compartment).
The product includes a Mounting bracket
A
located on its rear side. The Mounting bracket has:
l
an upper side provided with a spring
B
, and
l
a lower hooked side
C
Use the Mounting bracket to install the product on a DIN rail.
NOTICE
Make sure that the product is installed vertically (the DIN rail must be placed horizontally).
Make sure that the airflow is sufficient: allow a clearance of at least 1 rack unit above and
below the product
1
.
1
This is the minimum clearance to allow with a typical installation (BoltGATE 20-31 + BoltAIR 20-31 + BoltSER 20-31). If the number of Expansion
Modules increases, the clearance must be higher.
82 / 98
© 2022 Eurotech SpA - Via Fratelli Solari 3/A - 33020 AMARO (UD) - Italy
Code: BTGATE-20-31_MAN_EN_1-6
Revision: 1-6 2022.07.28
Summary of Contents for BoltGATE 20-31
Page 4: ...This page is intentionally left blank...
Page 8: ...This page is intentionally left blank...
Page 12: ...This page is intentionally left blank...
Page 16: ...This page is intentionally left blank...
Page 80: ...This page is intentionally left blank...
Page 97: ...BoltGATE 20 31 User manual Rev 1 4 Notes NOTES Id BTGATE 20 31_Man_ENG_1 4 97 98...