Instruction Manual MIXPRO 28 EUROPRO pag.19
MACHINE PREPARATION
1)
Supplies voltage to the electric panel.
2)
Don’t let unattended on the machine
3)
Control of water flow rate in the mixing chamber:
a.
Disconnect the water tube incoming in the trunket
b.
If the pressure indicated from the gauge is lower than 4 bar,
position the water pump selector on “Manual”
c.
If it is greater than 4 bar, position the water pump selector on
“Automatic”
4)
Open the water solenoid valve by pressing the blue button
5)
Set the water flow rate suggested:
Cement type
: 600 litres/min
–
Gaseous type
: 1000 litres/min
6)
Close the water solenoid valve by releasing the button and the water
flow stops;
7)
Connect the inlet water pipe of the mixing chamber inlet;
8)
To avoid starting the machine in "idle" status, it is necessary to let a
minimum quantity of water (0.5 litres) enter the mixing chamber;
9)
Open the water valve by pressing the blue button for at least 6 s.
10)
Loading of the product:
d.
Load the pre-mixed products on the hopper cutting them at the
bottom with the cutting blade
e.
Flow the product inside the hopper
11)
Preparation of mixture:
a.
Disconnect the material conveying tube from the machine
material output connection pulling the side levers and connect it
to the service tap to than perform the internal wetting;
b.
Position the water pump selector on "Automatic";
c.
Start the cell wheel bringing the selector on "I";
d.
Visually inspect the consistency of the mixture coming out from
the material outlet connection;
e.
Increase or decrease the water flow rate incoming in the trunket
acting on the rela-ted adjustment valve till obtaining the wished
consistency;
f.
Stop the machine pressing the button
“0”;
g.
Connect the material conveying tube to the machine material
out-put connection pulling the side levers.
h.
Connect the lance to the material hose and to the water hose.