Instruction Manual MIXPRO 28                         EUROPRO                                        pag.9 

UNPACKING  

1)

 

Remove the protective film; 

2)

 

Remove the above components from the hopper protection grid 

3)

 

With a proper tool, cut the straps paying attention not to be hit by the 
same due to their elasticity; 

4)

 

With the help of a second operator, let the machine carefully get off the 
pallet lifting it using the proper handles positioned on the machine sides; 

 

USE DESTINATION 

The machine has been designed and manufactured for the following destination 

of use:

 

 

 

 
 

 
 
 
 
 
 
 

 
 

 
 

 

 

 

Any other different use is potentially inappropriate. 
 

DISPOSAL  

At the disposal time of the machine, compulsorily observe the provisions of the               
regulations in force. 
Separate the parts making up the machine according to the different 
construction        materials (plastic, copper, iron, etc...). 
Lubricant liquids and any other fluids shall absolutely not be dispersed in the                      
environment. 

 

 

DESTINATION 
OF USE  

Building sector.  

PLACE OF 
WORK  

Building  site,  iside  or  outside  sufficiently  lightted 
and  suita-ble  buldings  complying  with  the 

regulations in force in the country of use on safety 
and health on work positions. The machine has to 

lean  on  a  surface  assuring  its  stability  whit 
reference to its weight and its overrall dimen-sions 

FORESEEN 
USE  

Mixing and spraying of pre-mixed products having 
a  max.  granulometry  of  3  mm,  suitable  for 

plastering and mechanical processing.  

CHARGED 

 

WITH THE 
USE 

 

A  single  authorized  operator  meeting  the 

professional requi-rements described in par. 

Summary of Contents for MIXPRO 28

Page 1: ...RIGINAL INSTRUCTIONS Revision n of EUROPE PROJECTION Z I Rousset Parc Club 343 avenue Francis Perrin 13106 Rousset T l 00 33 0 4 42 29 08 96 Fax 00 33 0 4 42 53 44 36 SAS au capital de 400 000 SIREN 3...

Page 2: ...E 12 ASSEMBLING OF ROTOR AND MIXER 13 WATER CONNECTION 13 CONNECTION OF THE MATERIAL CONVEYING TUBE 14 CONNECTION OF THE MATERIAL CONVEYING AND AIR TUBES TO THE SPRAYING NOZZLE 14 ELECTRICAL CONNECTIO...

Page 3: ...nufacturer or the Authorized Dealer At the end of the testing the Manufacturer or Authorized Dealer fills in the testing and commissioning certificate which is signed by the testing technician the ope...

Page 4: ...Year of construction 2021 It s conformed to the following European Directives and the following modifications Directive 2006 42 CE recognize in Italy with D Lgs 17 2010 Machinery Directive Directive 2...

Page 5: ...0 v 50 Hz Water MORTAR 3 KW 230 v 50 Hz Water FLOOR SCREED 230 v 50 Hz Water Protection grade of switchboard IP44 Hopper capacity 70 litres Water pump flow rate 8 26 litres min Max served distance 40...

Page 6: ...Instruction Manual MIXPRO 28 EUROPRO pag 6 39 11 4 3 2 1 12 10 9 13 34 33 32 31 30 29 35 36 37 16 17 19 20 7 8 5 22 21 14 15 26 27 25 24 23 41 6 38 40 28...

Page 7: ...inlet in the mixing chamber all products except light ones 18 Water line pression guage 19 Bag cutting blade 20 Gearmotor power suppli plug 21 Compressor 22 Main power suppli plig 23 Command and cont...

Page 8: ...No 1 Air tube ext 19 mm L 16 m only for mod TOP No 1 Strike material conveying tube variable section L 20m mod EWI No 1 Air tube L 21 m mod EWI Components positioned in the tool carrying box No 1 Inst...

Page 9: ...ons of the regulations in force Separate the parts making up the machine according to the different construction materials plastic copper iron etc Lubricant liquids and any other fluids shall absolute...

Page 10: ...Instruction Manual MIXPRO 28 EUROPRO pag 10 MACHINE TRANSPORT In the drawing are visible the coupling points for the transport and handling of the machine...

Page 11: ...he machine is not suitable to use in environments with potentially explosive atmospheres Atex 8 Only one operator at time on the machine 9 The machine has not been conceived for to transport and or li...

Page 12: ...MEASURES Hopper protection grating Cutting hazard in case of contact with the bag cutting blade Education training Material conveying tube hazard to be hit by the ejection of material subject to pres...

Page 13: ...Instruction Manual MIXPRO 28 EUROPRO pag 13 ASSEMBLING OF ROTOR AND MIXER Carry out the operations by following the letters in succession WATER CONNECTION A B C E D A B...

Page 14: ...8 EUROPRO pag 14 CONNECTION OF THE MATERIAL CONVEYING TUBE Attention Performing the disconnection only in the absence of pressure indicated in gauge CONNECTION OF THE MATERIAL CONVEYING AND AIR TUBES...

Page 15: ...to power supply outlets of house systems Verify to provide voltage and power appropriate to the machine Verify that thermal magnetic circuit breaker protection and residual current protection life sa...

Page 16: ...erse run by hold action Up pos It reverse the mixer rotation direction mixer only with the machine in stopped status Down pos Return 5 Orange green red warning light Maxi LED for machine status self t...

Page 17: ...tion mixer only with the machine in stopped status 5 Orange green red warn ing light Maxi LED for machine status self test 6 Three position selector I Return 0 Start Stop Pos I It switches the machine...

Page 18: ...off 5 Make sure that the safety devices are integral properly installed and working 6 Make sure that the service taps and the system water drain are closed 7 Make sure that the valve of the spraying n...

Page 19: ...r 0 5 litres enter the mixing chamber 9 Open the water valve by pressing the blue button for at least 6 s 10 Loading of the product d Load the pre mixed products on the hopper cutting them at the bott...

Page 20: ...he spraying nozzle Adjust the spraying of the material moving forwards and or backwards or the air tube acting on the screw and blocking it in the correct position WORK BREAK 1 Stop the machine by clo...

Page 21: ...RIAL HOSE 1 Disconnect the material conveying tube to the connection pulling the side levers 2 Insert the into the material conveying tube the two foam rubber balls standard supplied 3 Insert the two...

Page 22: ...h water 2 Clean the air tube from any scaling using the specific brush supplied SWATER DRAINAGE DURING WINTER PERIOD 1 Disconnect the water inlet tubes of the machine and mixing chamber 2 Open the tap...

Page 23: ...or stator assembly 5 insert the power supply plug 4 The gearmotor stops thermal protection tripping 1 mixture too hard 2 use of a too long tube compa red to the material used 3 use of not suitable mat...

Page 24: ...t f r o m t h e spraying noz zle too liquid 1 excessive water flow rate 2 mixture scaling on the mixer 3 obstruction of the material output connection 1 reduce the water flow rate acting slow ly on th...

Page 25: ...products Replacement Every 30 40 hours of work Rotor screw stator plenum chamber used with gaseous products Replacement Every 100 150 hours of work Mixer Replacement Daily Safety devices Functional ve...

Page 26: ...form the manufacturer in case of defect detection immediately and in any case not later than 8 eight days from the detection date moreover it has to allow if deemed necessary by the same the performan...

Page 27: ...Instruction Manual MIXPRO 28 EUROPRO pag 27...

Page 28: ...28 Thank you for choosing our products Distribu par EUROMAIR DISTRIBUTION Rousset Parc Club 343 avenue Francis Perrin 13106 Rousset T l 00 33 0 4 42 29 08 96 Fax 00 33 0 4 42 53 44 36 SAS au capital d...

Reviews: