00070444.DOC, Version 1.2
12/13
A skilled person has to approve the flying construction before every use. This approval includes appearance
and load tests when moved in accordance with the BGV-A2 for electrical devices.
Procedure:
The installation should be attached outside areas where persons may walk by or be seated.
The installation has to be attached out of the reach of people.
The device must not be installed on a truss system
4.1 Attachment
Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscilation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the srews are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1:
On the rear panel, there are 2 holes for the installation.
Step 2:
Hold the rear panel onto the location where the device is to be installed.
Step 3:
Mark the boreholes with a pen or a suitable tool.
Step 4:
Drill the holes.
Step 5:
Hold the rear panel in the desired position and tighten it.
4.2 Connections
4.2.1 Connection with the mains
Connect the device to the mains with the CEE plug.
The earth has to be connected!
If the device will be directly connected with the local power supply network, a disconnection switch with a
minimum opening of 3 mm at every pole has to be included in the permanent electrical installation.
You can connect more power distributions via the connection socket.
4.2.2 Outputs
Connect your loads via the output-sockets. Please note that the maximum current must never be exceeded.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
5. CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.