www.etsnord.fi
46
RDT-07-0121
®
NORD
fire
|
FDMB
Fig. 56 Solid ceiling construction- Weichschott
EIS 90
Position: * min. 110 - Concrete/ min. 125 - Aerated concrete
1 Fire damper
2 Solid ceiling construction
3 Fire resistant board
4 Fire stop coating thickness 1 mm
5 Duct
Used materials - example:**
3 Hilti CFS-CT B 1S 140/50
4 Hilti CFS-CT
** Fire resistant insulation and fire resistant board can be replaced by another approved fire sealing
system for damper installation with equivalent material properties.
Shown schemes of incorporation and damper are illustrative only!