
5 www.ETiSSL.com
Please contact 1-855-384-7754 for further assistance.
4
Feeding the wires
NOTE:
Put the gasket (BB) on any knock out hole on the fixture to better protect the wires.
□
Feed the electrical connection wires through any knock out hole, through the gasket (BB), and then through
the mounting bracket (AA).
Knock out holes
Keyholes
A
Installation (continued)
3
Marking the mounting location
□
With help from another person, temporarily
hold the fixture housing (A) up to the ceiling to
determine the best mounting position and which
knock out hole to use for wiring the fixture.
□
Mark two keyhole
locations on the mounting
surface.
AA
BB
Knock out holes
A