background image

E T C   I n s t a l l a t i o n   G u i d e

Paradigm P-LCD Series

Unison  Paradigm  Touchscreen  Rack  Panel

Page 2 of 4

Electronic Theatre Controls, Inc.

Installing the Termination PCB

The printed circuit board (PCB) assembly is designed to accommodate 

either

 Ethernet or LON 

connections. Prior to installing the PCB, terminate all necessary wiring. The PCB is installed on the 
back side of the rack panel.

The PCB consists of three parts:

• PCB with female RJ11, LinkPower connector, 24 Vdc (Aux) connector, and ground spade
• RJ45 with punch down wire termination
• Mounting bracket and screws

Connecting Ethernet

Step 1:

Terminate the network wiring in the RJ45 punch down strip using a standard 110 punch 

down tool (not provided). Reference the connector label for the CAT5e wire termination 

color code. The punch down connector provides insulation displacement. Do not strip the 

wires.

Step 2:

Snap the RJ45 connector into the bracket.

Connecting LinkPower and Auxiliary Power

Use the provided WAGO CAGE CLAMP

®

 connectors to terminate the wiring to the provided LinkPower 

(black and white twisted pair) and Auxiliary power (red and black twisted pair) and ground wire pigtails. 
Strip the ends of each wire (both installed control wires and pigtail wires) approximately 3/8” (10mm).

Step 1:

Terminate the installed LinkPower wiring to the white and black LinkPower pigtail. Using 

two Wago connectors connect (typically white) installed wire(s) with white pigtail wire and 

connect the (typically black) installed wire(s) with black pigtail wire as shown below.

C A U T I O N :

Only one network type may be connected to the touchscreen. Damage will occur if 

both power types, Auxiliary power and PoE, are connected to the Touchscreen.
ETC requires that all backboxes are grounded in accordance with local electrical 

codes. 
The RJ11 connection must be used to provide a ground connection from the backbox 

to the touchscreen even when Ethernet connectivity is used.

N o t e :

All Ethernet terminations must follow IEEE 802.3 and be terminated to the T568B 

standard.

Ground spade

PCB

24 Vdc Aux 

power 

connector

RJ45 

Mounting bracket

ULP connector

RJ45 Ethernet with

(PoE to Touchscreen)

RJ11 connector

(provides LinkPower and 

Aux power to Touchscreen)

topology of a single 

station installation

topology of multiple 

stations installed in 

series

Installed control wire

Pigtail wire

Installed control wire

Installed control wire to next station

Pigtail wire

Summary of Contents for Paradigm P-LCD Series

Page 1: ... a rack panel which is shipped separately The Touchscreen is also available in locking cover and wall mount configurations The Touchscreen is powered by either LinkPower and Auxiliary power or PoE Power Over Ethernet 802 3af Echelon LinkPower LinkConnect control network utilizing Belden 8471 or approved equal and 24 Vdc Auxiliary power two 16 AWG 1 5mm2 wires PoE Power over Ethernet 802 3af utiliz...

Page 2: ...nd black twisted pair and ground wire pigtails Strip the ends of each wire both installed control wires and pigtail wires approximately 3 8 10mm Step 1 Terminate the installed LinkPower wiring to the white and black LinkPower pigtail Using two Wago connectors connect typically white installed wire s with white pigtail wire and connect the typically black installed wire s with black pigtail wire as...

Page 3: ...ep 1 Position the PCB on the four standoffs on the back of the rack panel and secure with two M3x10mm pan head screws on the RJ11 side of the PCB only Step 2 Place the bracket and RJ45 assembly if used on top of the PCB Secure the PCB to the backbox through the remaining holes in the PCB with two M3x10mm pan head screws Step 3 A ground connection is required for all Touchscreen assemblies Using on...

Page 4: ...e collar Then lift the bottom upward slightly and rotate outward Indicators After the Touchscreen has been powered up the appropriate LEDs on the service panel on the bottom of the Touchscreen illuminate The LCD displays a startup screen a few seconds after booting I O Indicators Reset when pressed resets the Portable LCD software Mode press once for Setup menu Press and hold for 4 seconds to cali...

Reviews: