ETC Installation Guide
ArcSystem Pro Multi-Cell
ArcSystem Pro Multi-Cell
Page 11 of 24
ETC
Install the Fixture
Instructions for installing 100–277 V standard fixtures are below. See
Emergency Multi-Cell Fixtures on page 15
for instructions on installing 100–277 V emergency
fixtures.
Two-cell
fixture
Four-cell
square fixture
Four-cell
linear fixture
Eight-cell
fixture
A
A
A
A
C
B
C
B
C
B
C
B
A wiring compartment
B
conduit entry for 1/2 in conduit
C DMX in and thru
Note:
Mounting hardware and installation location must support the weight of the fixture,
conduit hardware, and all cable required for installation.
1.
Make sure power is off at the main circuit breaker.
2.
Attach a C-clamp or other mounting hardware (not provided) to the yoke of the fixture.
3.
Attach the fixture to a pipe or other approved mounting device.
4.
Insert or attach additional accessories, if desired.
5.
Using a Phillips head screw driver, remove the screws securing the cover to the fixture’s wiring
compartment. Set the screws aside for later re-installation. The cover is grounded to the
enclosure by a tether.
6.
Install conduit hardware at the conduit entry in the side of the wiring compartment.