Cleaning and maintenance
2500 h / annually
23
2.5.7
Establish operational readiness
Switch the boiler on via the mains switch and start
de-ashing.
Establish the boiler's power supply at the mains switch.
Press the [De-ash]
button to de-ash the boiler.
Switch the boiler back on with the On/Off
switch.