46
www.eta.co.at
Installing the pellet bin
Installation
3. Loosen the screws on the lid. Carefully lift the lid
and place it on the pellet hopper.
Fig. 9-25: Lid
4. Dismantle the pellet hose connection. Also remove
the blind cover from the desired position. In this
example, the connection is rotated by 90°.
Fig. 9-26: Replacing the connection and blind cover
Replace the connection and blind cover and
reinstall them on the pellet hopper. Make sure not
to damage the included seal during installation.
5. Turn the lid and re-attach it. Both connectors for
the pellet hoses must point in the same direction.
Fig. 9-27: Attaching the lid
6. Re-attach the covers.
Fig. 9-28: Side panels
Summary of Contents for ePE-K 140
Page 1: ...2020 07 21 EN 0000000451 V 008 5303 00 939074 003 Pellet boiler ePE K 140 170 kW Installation ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 82: ...www eta co at ...
Page 83: ......
Page 84: ...www eta co at www eta co at downloads DOWNLOAD ...