EP1000 PLC Quick User Manual
6
Caution
There is a toggle switch
S1
on the left of EP1002 module, which is used for
identifying the terminal. When the modules have been assembled, the EP1002
module on the very right must turn the toggle switch to
ON
, while the other EP1002
modules must turn the toggle switch to
OFF
.
There are two toggle switches
S1
and
S2
on the left of EP1810 module (EP1800
only has one toggle switch
S1
), which also are used for identifying the terminal
respectively. If EP1810 or EP1800 is in the terminal of whole network, the
corresponding toggle switch must be turned to
ON
; or else, it must be
OFF
.
3
Install the other modules in proper sequence
Left
Right
Push back the locker
4
3
Push back the locker of the right module.
4
Install the other modules in proper sequence.
Caution
The module on the left of CPU module only can be a communication module,
please install other modules on the right of CPU module.
If there is no communication module in the PLSs, you must add a head shield on
the left interface of CPU module.
The layout of IO modules can be free. However, we suggest you install the same
kind modules together. And, the very right of PLCs must be an EP1002 module.
5
Push up the clasp one by one
Embed DIN Rail
in the modules
Gravity Nut
Choose a proper
position for the
mounting
a
b
6
DIN Rail
must be
grounded
5
Install the modules on the DIN Rail.