Page 11
Gateway mounting operations
Check the GSM signal strength through the green indicator LED
(see “SIGNALS”) and identify an area where the signal is strong
enough.
Note: the signal strength may vary according to the
telephone provider.
Drill two holes with 5 mm diameter on the wall at a distance of 50
mm.
Insert the 2 fischers and screw down until the screws are at a 5
mm distance from the wall.
Place the GSM400 gateway onto the two screws through the two
back slots.
Summary of Contents for GSM400
Page 1: ...29 05 2013 User s manual ...
Page 49: ...Page 49 Connection example ...
Page 52: ...Page 52 Good signal level High signal level ...
Page 53: ...Page 53 NOTE ...
Page 54: ...GSM400 29 05 2013 ...