background image

 

PSM 10/12/15 Series Installation manual 

Esoltech AB, the battery company

 

 

May 1, 2019 

2. 

CABINET ASSEMBLY 

The cabinet is pre-assembled. The PSM cabinet is designed to be installed and used indoor 
only. Before installation, please make sure that: 

 

  the ambient temperature is 0 

– 45 deg. (recommended 25 deg.); 

  the relative humidity ranges 0-95%; 

  there is enough space around the cabinet to enable a safe installation.  

 

 

Note: the measurement in the diagram is not to the scale 

 

 

Summary of Contents for FerroAmp PSM 10 Series

Page 1: ...PSM 10 12 15 Series Installation manual Ver 1 02 Oct 2019 Esoltech AB the battery company...

Page 2: ...r modules 11 3 1 Touch Protection Covers 12 3 2 Insert the battery modules 14 3 3 Cable Installation 16 4 ESO module 20 4 1 ESO assembly 20 4 2 Insert the ESO 22 4 3 Cable installation 22 5 External c...

Page 3: ...high performance energy storage system is designed to be installed and operated together with the EnergyHub system with the patented Adaptive Current Equalization ACE technology FerroAmp Ferroamp Ele...

Page 4: ...following components Cabinet Battery modules Battery controller modules Energy Storage Optimizer ESO Accessories box Knowing your system components Battery module 4 pcs PSM10 5 pcs PSM12 6 pcs PSM15...

Page 5: ...cable 7 4 Battery Module Jumper Brick 6 5 Battery Module Mounting Bolts 18 M5 6 Wall mounting bolts 2 7 Wall mounting assembly 1 8 Wall mounting assembly bolts 2 9 Power Cable ESO Battery controller 2...

Page 6: ...bled The PSM cabinet is designed to be installed and used indoor only Before installation please make sure that the ambient temperature is 0 45 deg recommended 25 deg the relative humidity ranges 0 95...

Page 7: ...be fixed Figure A The wall mounting assembly can be attached to 3 locations on the cabinet The cabinet is shipped with the assembly preinstalled at location 1 Figure B Fix the wall mounting piece to...

Page 8: ...as a symmetric design meaning that the panels on the left hand side are identical and exchangeable to the ones on the right The diagram shows the upper side panels and one of the lower side panels are...

Page 9: ...lation manual Esoltech AB the battery company May 1 2019 9 2 3 Adjusting the feet There are 4 adjustable feet and the sockets are accessible when removing the side panels Using the hex key 5mm to adju...

Page 10: ...the LED connector socket inside the cabinet as indicated below There is only one direction the cable can be inserted firmly The following picture shows finished LED cable connection The other end of t...

Page 11: ...shipped with protection covers preinstalled Battery module Battery controller box The PSM system is shipped with one battery controller module and 4 6 battery modules depending on system configuratio...

Page 12: ...manual Esoltech AB the battery company May 1 2019 12 3 1 Touch Protection Covers For battery module The battery module with the protection covers removed cover piece 2 cover piece1 Transparent click...

Page 13: ...the battery company May 1 2019 13 For the battery controller module The battery controller module with the protection covers removed cover piece 1 cover piece 2 cover piece 3 Transparent click on piec...

Page 14: ...l be inserted one by one from the bottom of the cabinet Make sure all the bolts for the inserted module fastened before installing the next module Install the controller module after all the battery m...

Page 15: ...y company May 1 2019 15 The following is a side view of the system after insertion of the battery and controller modules Make sure all the bolts fastened before proceeding for safety installation Cont...

Page 16: ...Batt Power cable Batt comm cable Protective earth label 1 label 2 CON_BAT_NG BAT1_NG BAT1_PG BAT2_NG BAT2_PG BAT3_NG BAT3_PG BAT4_NG BAT4_PG BAT5_NG BAT5_PG BAT6_NG BAT6_PG CON_BAT_PG CON_COM2 BAT1_CO...

Page 17: ...t above and install the cables according to the numbering As indicated in the left hand side figure Connect the power cables solid line Connect then the communication cables dashed line Install the ba...

Page 18: ...PSM 10 12 15 Series Installation manual Esoltech AB the battery company May 1 2019 18 3 3 2 Connection overview and the numbering of the cables PSM10 Batt Comm Batt Power PE Connection 6mm...

Page 19: ...PSM 10 12 15 Series Installation manual Esoltech AB the battery company May 1 2019 19 Zoomed in...

Page 20: ...mbly Each ESO module resembles a rectangular metal box Please skip to 4 2 if ESO is shipped pre assembled 4 1 ESO assembly The following instruction applies to the two ESO system with a nominal power...

Page 21: ...firmly insert the adaptor into the sockets fasten the screws 4 pcs Note do not lift the ESO off the supporting surface during the assembly Install the ESO front plate Carefully align the ESO front pl...

Page 22: ...battery company May 1 2019 22 4 2 Insert the ESO Insert the assembled ESO sideways and fasten the bolts 4 3 Cable installation Power cables The following diagram shows the power cable connecting the...

Page 23: ...o be connected only when installing the external cable The external cable installation is covered in Section 5 Communication cable The communication between ESO and the battery controller module is th...

Page 24: ...two external cables One DC Link cable connecting to the FerroAmp EnergyHub One AC cable connecting to single phase wall socket 230VAC The following diagram shows a typical external cable installation...

Page 25: ...e before connection To connect the cable Peeling off the cable insulation according to the following diagram Install one cable at a time apply force evenly and gently in the direction towards the cabl...

Page 26: ...battery company May 1 2019 26 To remove an installed cable use a flat blade screwdriver 2mm firmly insert the flat blade into the locking releasing hole next to the cable socket diagram below Pull out...

Page 27: ...the battery company May 1 2019 27 The PE cable Connect the PE cable to metal bar inside the cabinet 5 2 AC cable Only for controller model H100030H P02 The module comes with a cable terminal block in...

Page 28: ...lug in the terminal block and fasten the screws flat blade 2mm Note an alternative terminal block PLTB2 5 BF SP with a push release mechanism instead of fastening bolt may also be found in the package...

Page 29: ...e back side of the ESO no empty socket Cables on the front side of controller module Protection covers on both the battery and controller modules 6 1 Jumper bricks Both the battery and the controller...

Page 30: ...ollowing diagram The battery controller has no power output if the QS breaker is switched off The QS breaker on the battery controller module is switched on by default Make sure all the connection is...

Page 31: ...u may hear click which indicate the system initiates self diagnosis Your PSM system is now ready Contact your system administrator for a proper setting of the PSM in your FerroAmp Portal system After...

Page 32: ...off Self inspection LED flashing Charging SOC 0 20 LED1 LED5 flashing SOC 21 40 LED2 LED5 flashing SOC 41 60 LED3 LED5 flashing SOC 61 80 LED4 LED5 flashing SOC 81 100 LED5 flashing Over vol warning O...

Page 33: ...AB the battery company May 1 2019 33 Manufacture supplied information 1 Battery Module Model No H102025M S with High voltage Control Module 2 Battery controller module HV control module H100030H P01 o...

Page 34: ...8 mm gPV SOC precision 5 Standby consumption incl DC DC converters 5 W 10 W Protection functions Over voltage over temperature over current isolation fault pre charge protection short circuit protecti...

Reviews: