25mm
140mm
35mm
2
Plastic tube(3x30mm)
2
Steel wire (0.5x3000mm)
1
3
2
2
Clevis
Retainer
Washer(3x15mm)
Lock Nut (3mm )
1
Screw (3x80mm)
2
Copper joiner
Rod (2X300mm)
1
Tail wheel
Washer(3x15mm)
Screw (3x80mm)
Lock Nut (3mm )
Clevis
Aluminum tube
Steel wire
The sketch map after the rudder shaft assemble finished.
3mm
3mm
Rod (2x300mm)
Lock Nut (3mm )
Washer(3x15mm)
Clevis
Clevis
Screw (3x65mm)
1
Clevis
4
Steel wire (0.5x3000mm)
4
4
Copper joiner
Aluminum tube(3x6mm)
2
Plastic tube(3x30mm)
2
2
6
Clevis
Washer(3x15mm)
Lock Nut (3mm )
1
Screw (3x80mm)
4
Clevis
4
Nut (2mm )
4
Screw (2x10mm)
4
Washer(2x5mm)
8
TP Screw (2.3x8mm)
Ply (15x15x3mm)
8
TP Screw (2.3x8mm)
Epoxy ply to appropriate position in the fuselage
and assemble the tail gear cover with screw.
1
1
Rod (2x300mm)
Retainer
Assemble the horn to the rudder and connect the linkage
to the servo.
Drill holes to appropriate position in the fuselage the
position of the horn in the rudder.
Retainer
The sketch map of the linkage for the rudder
and the tail wheel.
The sketch map of the linkages for the rudder
and elevator in the fuselage.
50
51
52
53
54
10
50
Accessory list for the coming installation steps.
TP Screw(3x20mm)
Washer (3x6mm)
4
4
40mm
suggest drilling a hole here for
assembling wheel steeling
mount
8mm
Collar
Tail landing gear
Collar
Make sure hinges are
mounted in the same line.
82.5mm
40mm
82.5mm
Collar
25mm
1.8mm
D'
C
C'
D
Make sure to glue securely.
If not properly glued, a failure in flight may occur.
Temporarily fasten down the main wing and
check its correct position.
Securely glue together.If coming off during flights,
you'll lose control of your airplane which leads
to accidents!
C = C '
D = D '
Pin hinge(2.5x48mm)
3
1mm
Rudder
Tailing
edge
Cut away the rubber tube when
the epoxy glue dried.
Make sure they are in
the right position while
installing.
Epoxy the fibreglass tubes to appropriate position as
below and leave some space with width of 1mm between
tailing edge and rudder.
The sketch map when the tail landing gear be installed
to the fuselage.
Assemble the tail landing gear to the wheel steeling
mounts as below.
Assemble the wheel steeling mount to appropriate
position.
Drill holes to appropriate position in the rudder and epoxy
the ping hinges in them
Assembly of the stabilizer.
34
35
36
37
38
33
7