background image

Concrete Finisher Manual (Version 1) 

 

13 

Service and Maintenance 

 

 

 

 

Maintenance 

The ESI concrete finisher is designed to give many years of trouble-free operation. It is, however, 

important that the simple regular maintenance listed in this section is carried out. It is 

recommended that an approved ESI  dealer carry out all major maintenance and repairs. Always 

use genuine ESI  replacement parts, the use of  non-genuine ESI  parts may void your warranty. 

Before any maintenance is carried out on the machine, switch off the engine and disconnect the 

spark plug. Always set the machine on level ground to ensure any fluid levels will be correctly 

read. Only use recommended oils. 

 

Running In Period 

When the concrete finisher is used for the very first time the engine oil must be changed after the 

initial running in period. (See engine manual for full details). 

 

Machine Cleaning 

Clean the  machine after it has been used to prevent the collection of hardened cement. The 

blades can usually be cleaned with a high-pressure hose and water while the concrete is still wet. 

Hard cement/concrete is very difficult to remove. Immediately replace any labels/stickers should 

you notice that they are worn, missing, or damaged. 

 

Changing Blades 

Be sure the spark plug is disconnected before changing the blades. Make sure the machine is on a 

flat surface; adjust the pitch control so that the blades are flat on the surface. 

 

 

 

 

 

 

Remove bolts and lock washers on each  concrete finisher  arm and remove the blades. Before 

fitting new blades, clean all cement/concrete from bottom and side of the concrete finisher. Be sure 

the concrete finisher’s edge of the blade is behind the concrete finisher arm. Install bolts and lock 

washers on each of the concrete finisher arms and fasten them. 

Before carrying out any maintenance on this machine,  ensure the engine has 

been switched off.  The engine should also be allowed to cool as parts of the 

engine become hot during use. 

 

 

 

 
 

CAUTION 

Be careful when  replacing  old blades with  new  blades.  Due to the way the 

blades wear, the old blades become very sharp and can cut easily. Wear heavy 

duty gloves to avoid injury. 

BLADES MUST BE REPLACED AS A SET!!! 

 

 

 

 

 
 

CAUTION 

Summary of Contents for EWT120

Page 1: ...Operator s Manual Concrete Finishers Range Concrete Finisher EWT90 EWT120 Manual Version 1...

Page 2: ...2 Concrete Finisher Proposition Warning...

Page 3: ...e s curit des machines et des crit res associ s et configur s si applicable Les missions debruit sont conformes la directive 2005 88 CE Annexe VI pour machines article 12 L objet mentionn est T V Rhei...

Page 4: ...SI reserves the right to change machine specification without prior notice or obligation Safety Notation Explanation Texts in this manual to which special attention must be paid are shown in the follo...

Page 5: ...fely switch this machine OFF before you switch it ON in case you run into any difficulties Always switch OFF the engine before servicing it During use the engine becomes very hot Always allow the engi...

Page 6: ...vapors and avoid contact with your skin Wash fuel splashes immediately If you get fuel in your eyes irrigate with a large amount of water and seek medical attention as soon as possible Exhaust Fumes P...

Page 7: ...t of the machine s components and their respective materials Take the discarded apparatus to the relevant recycling facilities Component Material Operator Handle Steel Belt Guard Glass Fiber Blade Gua...

Page 8: ...Tank 7 Recoil Starter 8 Blade Guard 9 Belt Guard 10 Handle Height Adjuster 11 Lifting Bar 5 4 6 7 9 8 3 10 2 1 11 1 Throttle Lever 2 Pitch Control Lever 3 Centri safety Switch Handle 4 Handle Height A...

Page 9: ...gine oil with the proper viscosity SAE 10W 30 recommended 4 Check the engine fuel level and top up as necessary Use clean fuel Use of contaminated fuel would damage the fuel system Do not overfill fue...

Page 10: ...upply Refer to Engine User Manual Operation Before Starting the Engine 1 Visually check to be sure that the blades are free of obstructions and the area is clear for operation 2 Grip the operator s ha...

Page 11: ...ab Floating Operation Floating can be performed by using either the combination blades furnished with the machine or the optional Float Pan If using the float pan before starting the floating operatio...

Page 12: ...sher at all times Pitch Adjustment The pitch control knob or the optional blade pitch lever is in easy reach of the operator The pitch adjustment has a limited pitch variation Rotate the pitch control...

Page 13: ...cleaned with a high pressure hose and water while the concrete is still wet Hard cement concrete is very difficult to remove Immediately replace any labels stickers should you notice that they are wo...

Page 14: ...nally replace the belt guard ensuring it is correctly and securely fitted Routine maintenance Daily After first 4 hrs weekly First month 20 hours Every 3 months 50 hrs Every 6 months 100 hrs Air Filte...

Page 15: ...dd oil to the recommended level b Keep speed high c Clean air filter d Remove cement concrete on concrete finisher e Retighten V belt Machine engine runs but machine does not a Presence of water in th...

Page 16: ...ING DIAMETER in mm 39 1 992 47 2 1 200 OPERATING WEIGHT lb kg 170 77 209 95 HANDLE TYPE STRAIGHT STRAIGHT GEARBOX HEAVY DUTY HEAVY DUTY MAX BLADE PITCH ANGLE 15 15 NO OF BLADES 4 4 BLADE OPERATING SPE...

Page 17: ...sh away concrete accumulated on the concrete finisher Clean the engine mounting plate Apply a light coat of oil on arbor shaft blade retaining cap and backing plate to prevent rust formation Cover the...

Page 18: ...o renew repair or replace components due to fair wear and tear 5 The engine air filter and the engine spark plug The engine will be warranted by the engine manufacturer Please contact the nearest engi...

Page 19: ...Notes...

Page 20: ...EQUIPMENT SYNERGY INTERNATIONAL 7422 Rock Hollow Lane PO Box 1902 Midland Michigan 48642 48641 USA 1 336 454 2665 1 866 648 7101 service theESIchoice com www theESIchoice com...

Reviews: